Files
AIclinicalresearch/docs/08-项目管理
HaHafeng e3e7e028e8 feat(platform): Complete platform infrastructure implementation and verification
Platform Infrastructure - 8 Core Modules Completed:
- Storage Service (LocalAdapter + OSSAdapter stub)
- Logging System (Winston + JSON format)
- Cache Service (MemoryCache + Redis stub)
- Async Job Queue (MemoryQueue + DatabaseQueue stub)
- Health Check Endpoints (liveness/readiness/detailed)
- Database Connection Pool (with Serverless optimization)
- Environment Configuration Management
- Monitoring Metrics (DB connections/memory/API)

Key Features:
- Adapter Pattern for zero-code environment switching
- Full backward compatibility with legacy modules
- 100% test coverage (all 8 modules verified)
- Complete documentation (11 docs updated)

Technical Improvements:
- Fixed duplicate /health route registration issue
- Fixed TypeScript interface export (export type)
- Installed winston dependency
- Added structured logging with context support
- Implemented graceful shutdown for Serverless
- Added connection pool optimization for SAE

Documentation Updates:
- Platform infrastructure planning (04-骞冲彴鍩虹璁炬柦瑙勫垝.md)
- Implementation report (2025-11-17-骞冲彴鍩虹璁炬柦瀹炴柦瀹屾垚鎶ュ憡.md)
- Verification report (2025-11-17-骞冲彴鍩虹璁炬柦楠岃瘉鎶ュ憡.md)
- Git commit guidelines (06-Git鎻愪氦瑙勮寖.md) - Added commit frequency rules
- Updated 3 core architecture documents

Code Statistics:
- New code: 2,532 lines
- New files: 22
- Updated files: 130+
- Test pass rate: 100% (8/8 modules)

Deployment Readiness:
- Local environment: 鉁?Ready
- Cloud environment: 馃攧 Needs OSS/Redis dependencies

Next Steps:
- Ready to start ASL module development
- Can directly use storage/logger/cache/jobQueue

Tested: Local verification 100% passed
Related: #Platform-Infrastructure
2025-11-18 08:00:41 +08:00
..

项目管理

用途: 项目进度跟踪、计划管理、决策记录
维护者: 项目管理组
最后更新: 2025-11-07


📋 目录结构

08-项目管理/
├── 01-整体开发计划/        # 长期规划(季度/年度)
│   └── README.md
├── 02-里程碑规划/           # 中期规划(周/月)
│   ├── README.md
│   ├── 04-里程碑4-架构改造.md
│   └── 05-里程碑5-ASL模块开发.md
├── 03-每周计划/             # 短期跟踪(日/周)
│   ├── README.md
│   └── 周次-进度报告模板.md
├── 04-决策记录/             # 重要决策归档ADR
│   ├── README.md
│   ├── ADR模板.md
│   └── ADR-001-Schema隔离暂缓执行.md
└── 下一阶段行动计划-ASL启动.md  # 当前阶段行动计划 ⭐

🎯 当前阶段

下一阶段行动计划2025-11-07 至 2025-12-06

核心目标: Schema隔离 + 前端统一架构 + ASL核心功能

四周规划:

  • Week 1 Schema隔离3详细+7空
  • Week 2 前端统一架构 + 后端分层
  • Week 3-4 ASL核心功能4个LLM筛选
  • Week 5+ LLM网关统一 + 其他模块

当前版本: 下一阶段行动计划-V2.2-前端架构优先版.md

版本历史:

  • V2.2版(前端架构优先) - 2025-11-09 当前版本

    • 核心调整前端架构提前到Week 2避免返工
    • LLM网关推迟到Week 5聚焦核心
    • 4个LLM已配置DeepSeek/GPT-5/Claude-4.5/Qwen
  • V2.1版(务实版) - 2025-11-09

    • 核心调整3详细+7空Schema策略
    • Just-in-time设计避免过度设计
  • V2.0版(模块化架构优先) - 2025-11-07

    • 核心调整Schema隔离 + 独立部署架构
  • V1.0版ASL启动 - 2025-11-06

    • 初始版本直接启动ASL开发

🚀 快速导航

我想...

📋 了解项目整体规划
→ 查看 整体开发计划

🎯 了解当前阶段要做什么
→ 查看 下一阶段行动计划-V2.2(前端架构优先版)

📊 查看本周要做什么
→ 查看 每周计划

🔍 了解某个决策为什么这样做
→ 查看 决策记录


维护者: 项目管理组
创建日期: 2025-11-06
最后更新: 2025-11-07