Summary: - PostgreSQL database migration to RDS completed (90MB SQL, 11 schemas) - Frontend Nginx Docker image built and pushed to ACR (v1.0, ~50MB) - Python microservice Docker image built and pushed to ACR (v1.0, 1.12GB) - Created 3 deployment documentation files Docker Configuration Files: - frontend-v2/Dockerfile: Multi-stage build with nginx:alpine - frontend-v2/.dockerignore: Optimize build context - frontend-v2/nginx.conf: SPA routing and API proxy - frontend-v2/docker-entrypoint.sh: Dynamic env injection - extraction_service/Dockerfile: Multi-stage build with Aliyun Debian mirror - extraction_service/.dockerignore: Optimize build context - extraction_service/requirements-prod.txt: Production dependencies (removed Nougat) Deployment Documentation: - docs/05-部署文档/00-部署进度总览.md: One-stop deployment status overview - docs/05-部署文档/07-前端Nginx-SAE部署操作手册.md: Frontend deployment guide - docs/05-部署文档/08-PostgreSQL数据库部署操作手册.md: Database deployment guide - docs/00-系统总体设计/00-系统当前状态与开发指南.md: Updated with deployment status Database Migration: - RDS instance: pgm-2zex1m2y3r23hdn5 (2C4G, PostgreSQL 15.0) - Database: ai_clinical_research - Schemas: 11 business schemas migrated successfully - Data: 3 users, 2 projects, 1204 literatures verified - Backup: rds_init_20251224_154529.sql (90MB) Docker Images: - Frontend: crpi-cd5ij4pjt65mweeo.cn-beijing.personal.cr.aliyuncs.com/ai-clinical/ai-clinical_frontend-nginx:v1.0 - Python: crpi-cd5ij4pjt65mweeo.cn-beijing.personal.cr.aliyuncs.com/ai-clinical/python-extraction:v1.0 Key Achievements: - Resolved Docker Hub network issues (using generic tags) - Fixed 30 TypeScript compilation errors - Removed Nougat OCR to reduce image size by 1.5GB - Used Aliyun Debian mirror to resolve apt-get network issues - Implemented multi-stage builds for optimization Next Steps: - Deploy Python microservice to SAE - Build Node.js backend Docker image - Deploy Node.js backend to SAE - Deploy frontend Nginx to SAE - End-to-end verification testing Status: Docker images ready, SAE deployment pending
每周计划与进度跟踪
用途: 记录每周的工作计划、进度和总结
更新频率: 每周五下午更新
📋 使用说明
每周五下午做什么?
-
回顾本周
- 完成了哪些任务?
- 遇到了什么问题?
- 学到了什么?
-
记录进度
- 更新任务完成状态
- 记录关键决策
- 记录技术难点
-
规划下周
- 下周要做什么?
- 需要哪些资源?
- 有什么风险?
📊 进度报告列表
| 周次 | 时间范围 | 核心任务 | 完成度 | 报告链接 |
|---|---|---|---|---|
| W45 | 2025-11-04 至 11-10 | 文档重构 | 100% | 查看报告 |
| W46 | 2025-11-11 至 11-17 | 代码重构+LLM网关 | 0% | 📋 待创建 |
| W47 | 2025-11-18 至 11-24 | ASL标题摘要初筛 | 0% | 📋 待创建 |
维护者: 项目管理组
最后更新: 2025-11-07