Files
AIclinicalresearch/docs/08-项目管理
HaHafeng b64896a307 feat(deploy): Complete PostgreSQL migration and Docker image build
Summary:
- PostgreSQL database migration to RDS completed (90MB SQL, 11 schemas)
- Frontend Nginx Docker image built and pushed to ACR (v1.0, ~50MB)
- Python microservice Docker image built and pushed to ACR (v1.0, 1.12GB)
- Created 3 deployment documentation files

Docker Configuration Files:
- frontend-v2/Dockerfile: Multi-stage build with nginx:alpine
- frontend-v2/.dockerignore: Optimize build context
- frontend-v2/nginx.conf: SPA routing and API proxy
- frontend-v2/docker-entrypoint.sh: Dynamic env injection
- extraction_service/Dockerfile: Multi-stage build with Aliyun Debian mirror
- extraction_service/.dockerignore: Optimize build context
- extraction_service/requirements-prod.txt: Production dependencies (removed Nougat)

Deployment Documentation:
- docs/05-部署文档/00-部署进度总览.md: One-stop deployment status overview
- docs/05-部署文档/07-前端Nginx-SAE部署操作手册.md: Frontend deployment guide
- docs/05-部署文档/08-PostgreSQL数据库部署操作手册.md: Database deployment guide
- docs/00-系统总体设计/00-系统当前状态与开发指南.md: Updated with deployment status

Database Migration:
- RDS instance: pgm-2zex1m2y3r23hdn5 (2C4G, PostgreSQL 15.0)
- Database: ai_clinical_research
- Schemas: 11 business schemas migrated successfully
- Data: 3 users, 2 projects, 1204 literatures verified
- Backup: rds_init_20251224_154529.sql (90MB)

Docker Images:
- Frontend: crpi-cd5ij4pjt65mweeo.cn-beijing.personal.cr.aliyuncs.com/ai-clinical/ai-clinical_frontend-nginx:v1.0
- Python: crpi-cd5ij4pjt65mweeo.cn-beijing.personal.cr.aliyuncs.com/ai-clinical/python-extraction:v1.0

Key Achievements:
- Resolved Docker Hub network issues (using generic tags)
- Fixed 30 TypeScript compilation errors
- Removed Nougat OCR to reduce image size by 1.5GB
- Used Aliyun Debian mirror to resolve apt-get network issues
- Implemented multi-stage builds for optimization

Next Steps:
- Deploy Python microservice to SAE
- Build Node.js backend Docker image
- Deploy Node.js backend to SAE
- Deploy frontend Nginx to SAE
- End-to-end verification testing

Status: Docker images ready, SAE deployment pending
2025-12-24 18:21:55 +08:00
..

项目管理

用途: 项目进度跟踪、计划管理、决策记录
维护者: 项目管理组
最后更新: 2025-11-07


📋 目录结构

08-项目管理/
├── 01-整体开发计划/        # 长期规划(季度/年度)
│   └── README.md
├── 02-里程碑规划/           # 中期规划(周/月)
│   ├── README.md
│   ├── 04-里程碑4-架构改造.md
│   └── 05-里程碑5-ASL模块开发.md
├── 03-每周计划/             # 短期跟踪(日/周)
│   ├── README.md
│   └── 周次-进度报告模板.md
├── 04-决策记录/             # 重要决策归档ADR
│   ├── README.md
│   ├── ADR模板.md
│   └── ADR-001-Schema隔离暂缓执行.md
└── 下一阶段行动计划-ASL启动.md  # 当前阶段行动计划 ⭐

🎯 当前阶段

下一阶段行动计划2025-11-07 至 2025-12-06

核心目标: Schema隔离 + 前端统一架构 + ASL核心功能

四周规划:

  • Week 1 Schema隔离3详细+7空
  • Week 2 前端统一架构 + 后端分层
  • Week 3-4 ASL核心功能4个LLM筛选
  • Week 5+ LLM网关统一 + 其他模块

当前版本: 下一阶段行动计划-V2.2-前端架构优先版.md

版本历史:

  • V2.2版(前端架构优先) - 2025-11-09 当前版本

    • 核心调整前端架构提前到Week 2避免返工
    • LLM网关推迟到Week 5聚焦核心
    • 4个LLM已配置DeepSeek/GPT-5/Claude-4.5/Qwen
  • V2.1版(务实版) - 2025-11-09

    • 核心调整3详细+7空Schema策略
    • Just-in-time设计避免过度设计
  • V2.0版(模块化架构优先) - 2025-11-07

    • 核心调整Schema隔离 + 独立部署架构
  • V1.0版ASL启动 - 2025-11-06

    • 初始版本直接启动ASL开发

🚀 快速导航

我想...

📋 了解项目整体规划
→ 查看 整体开发计划

🎯 了解当前阶段要做什么
→ 查看 下一阶段行动计划-V2.2(前端架构优先版)

📊 查看本周要做什么
→ 查看 每周计划

🔍 了解某个决策为什么这样做
→ 查看 决策记录


维护者: 项目管理组
创建日期: 2025-11-06
最后更新: 2025-11-07