Platform Infrastructure - 8 Core Modules Completed: - Storage Service (LocalAdapter + OSSAdapter stub) - Logging System (Winston + JSON format) - Cache Service (MemoryCache + Redis stub) - Async Job Queue (MemoryQueue + DatabaseQueue stub) - Health Check Endpoints (liveness/readiness/detailed) - Database Connection Pool (with Serverless optimization) - Environment Configuration Management - Monitoring Metrics (DB connections/memory/API) Key Features: - Adapter Pattern for zero-code environment switching - Full backward compatibility with legacy modules - 100% test coverage (all 8 modules verified) - Complete documentation (11 docs updated) Technical Improvements: - Fixed duplicate /health route registration issue - Fixed TypeScript interface export (export type) - Installed winston dependency - Added structured logging with context support - Implemented graceful shutdown for Serverless - Added connection pool optimization for SAE Documentation Updates: - Platform infrastructure planning (04-骞冲彴鍩虹璁炬柦瑙勫垝.md) - Implementation report (2025-11-17-骞冲彴鍩虹璁炬柦瀹炴柦瀹屾垚鎶ュ憡.md) - Verification report (2025-11-17-骞冲彴鍩虹璁炬柦楠岃瘉鎶ュ憡.md) - Git commit guidelines (06-Git鎻愪氦瑙勮寖.md) - Added commit frequency rules - Updated 3 core architecture documents Code Statistics: - New code: 2,532 lines - New files: 22 - Updated files: 130+ - Test pass rate: 100% (8/8 modules) Deployment Readiness: - Local environment: 鉁?Ready - Cloud environment: 馃攧 Needs OSS/Redis dependencies Next Steps: - Ready to start ASL module development - Can directly use storage/logger/cache/jobQueue Tested: Local verification 100% passed Related: #Platform-Infrastructure
架构实施
文档定位: 架构演进、技术改造、工程实践
适用范围: 技术架构师、技术负责人
📋 目录结构
09-架构实施/
├── 02-数据库连接配置.md # ✅ Schema隔离的数据库配置
├── migration-scripts/ # ⏳ Schema迁移SQL脚本(Week 1创建)
├── 01-Monorepo架构设计/ # ⏳ Monorepo转换方案
├── 02-产品打包方案/ # ⏳ 独立产品打包流程
└── 03-微服务拆分/ # ⏳ 微服务拆分策略
🎯 核心内容
1. Monorepo架构设计
- Monorepo总体设计
- 包管理策略(pnpm workspaces)
- 代码共享与复用
- 构建和部署
2. 产品打包方案
- 独立产品打包流程
- 依赖管理
- 构建脚本
- 版本管理
3. 微服务拆分
- 拆分策略和时机
- 服务间通信
- API网关配置
- 数据迁移
📅 实施计划
阶段一:模块化单体(当前)
- 严格代码隔离
- Schema隔离(逻辑)
- 模块化设计
阶段二:首次拆分(6-18个月)
- Monorepo转换
- Schema物理隔离
- 拆分独立系统(RVW)
- 引入API网关
阶段三:全面微服务(18个月+)
- 所有模块独立部署
- K8s编排
- 服务网格
📚 快速导航
当前实施中(Week 1)
未来实施
- Monorepo架构设计 - ⏳ 待规划
- 产品打包方案 - ⏳ 待规划
- 微服务拆分 - ⏳ 待规划
🔗 相关文档
最后更新: 2025-11-06
维护人: 技术架构师