Files
AIclinicalresearch/docs/08-项目管理/03-每周计划
HaHafeng 8eef9e0544 feat(asl): Complete Week 4 - Results display and Excel export with hybrid solution
Features:
- Backend statistics API (cloud-native Prisma aggregation)
- Results page with hybrid solution (AI consensus + human final decision)
- Excel export (frontend generation, zero disk write, cloud-native)
- PRISMA-style exclusion reason analysis with bar chart
- Batch selection and export (3 export methods)
- Fixed logic contradiction (inclusion does not show exclusion reason)
- Optimized table width (870px, no horizontal scroll)

Components:
- Backend: screeningController.ts - add getProjectStatistics API
- Frontend: ScreeningResults.tsx - complete results page (hybrid solution)
- Frontend: excelExport.ts - Excel export utility (40 columns full info)
- Frontend: ScreeningWorkbench.tsx - add navigation button
- Utils: get-test-projects.mjs - quick test tool

Architecture:
- Cloud-native: backend aggregation reduces network transfer
- Cloud-native: frontend Excel generation (zero file persistence)
- Reuse platform: global prisma instance, logger
- Performance: statistics API < 500ms, Excel export < 3s (1000 records)

Documentation:
- Update module status guide (add Week 4 features)
- Update task breakdown (mark Week 4 completed)
- Update API design spec (add statistics API)
- Update database design (add field usage notes)
- Create Week 4 development plan
- Create Week 4 completion report
- Create technical debt list

Test:
- End-to-end flow test passed
- All features verified
- Performance test passed
- Cloud-native compliance verified

Ref: Week 4 Development Plan
Scope: ASL Module MVP - Title Abstract Screening Results
Cloud-Native: Backend aggregation + Frontend Excel generation
2025-11-21 20:12:38 +08:00
..

每周计划与进度跟踪

用途: 记录每周的工作计划、进度和总结
更新频率: 每周五下午更新


📋 使用说明

每周五下午做什么?

  1. 回顾本周

    • 完成了哪些任务?
    • 遇到了什么问题?
    • 学到了什么?
  2. 记录进度

    • 更新任务完成状态
    • 记录关键决策
    • 记录技术难点
  3. 规划下周

    • 下周要做什么?
    • 需要哪些资源?
    • 有什么风险?

📊 进度报告列表

周次 时间范围 核心任务 完成度 报告链接
W45 2025-11-04 至 11-10 文档重构 100% 查看报告
W46 2025-11-11 至 11-17 代码重构+LLM网关 0% 📋 待创建
W47 2025-11-18 至 11-24 ASL标题摘要初筛 0% 📋 待创建

维护者: 项目管理组
最后更新: 2025-11-07