Features - User Management (Phase 4.1): - Database: Add user_modules table for fine-grained module permissions - Database: Add 4 user permissions (view/create/edit/delete) to role_permissions - Backend: UserService (780 lines) - CRUD with tenant isolation - Backend: UserController + UserRoutes (648 lines) - 13 API endpoints - Backend: Batch import users from Excel - Frontend: UserListPage (412 lines) - list/filter/search/pagination - Frontend: UserFormPage (341 lines) - create/edit with module config - Frontend: UserDetailPage (393 lines) - details/tenant/module management - Frontend: 3 modal components (592 lines) - import/assign/configure - API: GET/POST/PUT/DELETE /api/admin/users/* endpoints Architecture Upgrade - Module Permission System: - Backend: Add getUserModules() method in auth.service - Backend: Login API returns modules array in user object - Frontend: AuthContext adds hasModule() method - Frontend: Navigation filters modules based on user.modules - Frontend: RouteGuard checks requiredModule instead of requiredVersion - Frontend: Remove deprecated version-based permission system - UX: Only show accessible modules in navigation (clean UI) - UX: Smart redirect after login (avoid 403 for regular users) Fixes: - Fix UTF-8 encoding corruption in ~100 docs files - Fix pageSize type conversion in userService (String to Number) - Fix authUser undefined error in TopNavigation - Fix login redirect logic with role-based access check - Update Git commit guidelines v1.2 with UTF-8 safety rules Database Changes: - CREATE TABLE user_modules (user_id, tenant_id, module_code, is_enabled) - ADD UNIQUE CONSTRAINT (user_id, tenant_id, module_code) - INSERT 4 permissions + role assignments - UPDATE PUBLIC tenant with 8 module subscriptions Technical: - Backend: 5 new files (~2400 lines) - Frontend: 10 new files (~2500 lines) - Docs: 1 development record + 2 status updates + 1 guideline update - Total: ~4900 lines of code Status: User management 100% complete, module permission system operational
84 lines
2.6 KiB
Markdown
84 lines
2.6 KiB
Markdown
# 项目管理
|
||
|
||
> **用途:** 项目进度跟踪、计划管理、决策记录
|
||
> **维护者:** 项目管理组
|
||
> **最后更新:** 2025-11-07
|
||
|
||
---
|
||
|
||
## 📋 目录结构
|
||
|
||
```
|
||
08-项目管理/
|
||
├── 01-整体开发计划/ # 长期规划(季度/年度)
|
||
│ └── README.md
|
||
├── 02-里程碑规划/ # 中期规划(周/月)
|
||
│ ├── README.md
|
||
│ ├── 04-里程碑4-架构改造.md
|
||
│ └── 05-里程碑5-ASL模块开发.md
|
||
├── 03-每周计划/ # 短期跟踪(日/周)
|
||
│ ├── README.md
|
||
│ └── 周次-进度报告模板.md
|
||
├── 04-决策记录/ # 重要决策归档(ADR)
|
||
│ ├── README.md
|
||
│ ├── ADR模板.md
|
||
│ └── ADR-001-Schema隔离暂缓执行.md
|
||
└── 下一阶段行动计划-ASL启动.md # 当前阶段行动计划 ⭐
|
||
```
|
||
|
||
---
|
||
|
||
## 🎯 当前阶段
|
||
|
||
### 下一阶段行动计划(2025-11-07 至 2025-12-06)
|
||
|
||
**核心目标:** Schema隔离 + 前端统一架构 + ASL核心功能
|
||
|
||
**四周规划:**
|
||
- **Week 1:** Schema隔离(3详细+7空)
|
||
- **Week 2:** **前端统一架构** + 后端分层 ⭐⭐⭐
|
||
- **Week 3-4:** ASL核心功能(4个LLM筛选)
|
||
- **Week 5+:** LLM网关统一 + 其他模块
|
||
|
||
**当前版本:** [下一阶段行动计划-V2.2-前端架构优先版.md](./下一阶段行动计划-V2.2-前端架构优先版.md) ⭐⭐⭐
|
||
|
||
**版本历史:**
|
||
- **V2.2版(前端架构优先)** - 2025-11-09 ⭐ 当前版本
|
||
- 核心调整:前端架构提前到Week 2,避免返工
|
||
- LLM网关推迟到Week 5,聚焦核心
|
||
- 4个LLM已配置(DeepSeek/GPT-5/Claude-4.5/Qwen)
|
||
|
||
- **V2.1版(务实版)** - 2025-11-09
|
||
- 核心调整:3详细+7空Schema策略
|
||
- Just-in-time设计,避免过度设计
|
||
|
||
- **V2.0版(模块化架构优先)** - 2025-11-07
|
||
- 核心调整:Schema隔离 + 独立部署架构
|
||
|
||
- **V1.0版(ASL启动)** - 2025-11-06
|
||
- 初始版本:直接启动ASL开发
|
||
|
||
---
|
||
|
||
## 🚀 快速导航
|
||
|
||
### 我想...
|
||
|
||
**📋 了解项目整体规划**
|
||
→ 查看 [整体开发计划](./01-整体开发计划/README.md)
|
||
|
||
**🎯 了解当前阶段要做什么**
|
||
→ 查看 [下一阶段行动计划-V2.2(前端架构优先版)](./下一阶段行动计划-V2.2-前端架构优先版.md) ⭐⭐⭐
|
||
|
||
**📊 查看本周要做什么**
|
||
→ 查看 [每周计划](./03-每周计划/README.md)
|
||
|
||
**🔍 了解某个决策为什么这样做**
|
||
→ 查看 [决策记录](./04-决策记录/README.md)
|
||
|
||
---
|
||
|
||
**维护者:** 项目管理组
|
||
**创建日期:** 2025-11-06
|
||
**最后更新:** 2025-11-07
|