Features - User Management (Phase 4.1): - Database: Add user_modules table for fine-grained module permissions - Database: Add 4 user permissions (view/create/edit/delete) to role_permissions - Backend: UserService (780 lines) - CRUD with tenant isolation - Backend: UserController + UserRoutes (648 lines) - 13 API endpoints - Backend: Batch import users from Excel - Frontend: UserListPage (412 lines) - list/filter/search/pagination - Frontend: UserFormPage (341 lines) - create/edit with module config - Frontend: UserDetailPage (393 lines) - details/tenant/module management - Frontend: 3 modal components (592 lines) - import/assign/configure - API: GET/POST/PUT/DELETE /api/admin/users/* endpoints Architecture Upgrade - Module Permission System: - Backend: Add getUserModules() method in auth.service - Backend: Login API returns modules array in user object - Frontend: AuthContext adds hasModule() method - Frontend: Navigation filters modules based on user.modules - Frontend: RouteGuard checks requiredModule instead of requiredVersion - Frontend: Remove deprecated version-based permission system - UX: Only show accessible modules in navigation (clean UI) - UX: Smart redirect after login (avoid 403 for regular users) Fixes: - Fix UTF-8 encoding corruption in ~100 docs files - Fix pageSize type conversion in userService (String to Number) - Fix authUser undefined error in TopNavigation - Fix login redirect logic with role-based access check - Update Git commit guidelines v1.2 with UTF-8 safety rules Database Changes: - CREATE TABLE user_modules (user_id, tenant_id, module_code, is_enabled) - ADD UNIQUE CONSTRAINT (user_id, tenant_id, module_code) - INSERT 4 permissions + role assignments - UPDATE PUBLIC tenant with 8 module subscriptions Technical: - Backend: 5 new files (~2400 lines) - Frontend: 10 new files (~2500 lines) - Docs: 1 development record + 2 status updates + 1 guideline update - Total: ~4900 lines of code Status: User management 100% complete, module permission system operational
里程碑规划
用途: 中期规划和里程碑管理
时间跨度: 周/月
最后更新: 2025-11-07
📊 里程碑概览
当前里程碑
里程碑4 - 架构改造 🚧 进行中
- 时间:2025-11-06 至 2025-11-15
- 进度:50%
- 核心任务:文档重构 ✅、Schema隔离 ⏳、代码重构 ⏳
里程碑5 - ASL模块开发 📋 规划中
- 时间:2025-11-15 至 2025-12-06
- 进度:0%
- 核心任务:标题摘要初筛、全文复筛
📋 里程碑列表
| 编号 | 名称 | 状态 | 时间 | 核心目标 |
|---|---|---|---|---|
| M4 | 架构改造 | 🚧 进行中 | 2025-11 | 建立模块化架构 |
| M5 | ASL模块开发 | 📋 规划中 | 2025-11-12 | 完成标题摘要初筛+全文复筛 |
| M6 | 运营管理端 | 📋 规划中 | 2026-01 | P0功能上线 |
| M7 | ASL完整功能 | 📋 规划中 | 2026-02 | 数据提取+分析报告 |
详细文档:
维护者: 项目管理组
最后更新: 2025-11-07