Files
AIclinicalresearch/docs/07-运维文档/10-Postgres-Only改造进度追踪表.md
HaHafeng 66255368b7 feat(admin): Add user management and upgrade to module permission system
Features - User Management (Phase 4.1):
- Database: Add user_modules table for fine-grained module permissions
- Database: Add 4 user permissions (view/create/edit/delete) to role_permissions
- Backend: UserService (780 lines) - CRUD with tenant isolation
- Backend: UserController + UserRoutes (648 lines) - 13 API endpoints
- Backend: Batch import users from Excel
- Frontend: UserListPage (412 lines) - list/filter/search/pagination
- Frontend: UserFormPage (341 lines) - create/edit with module config
- Frontend: UserDetailPage (393 lines) - details/tenant/module management
- Frontend: 3 modal components (592 lines) - import/assign/configure
- API: GET/POST/PUT/DELETE /api/admin/users/* endpoints

Architecture Upgrade - Module Permission System:
- Backend: Add getUserModules() method in auth.service
- Backend: Login API returns modules array in user object
- Frontend: AuthContext adds hasModule() method
- Frontend: Navigation filters modules based on user.modules
- Frontend: RouteGuard checks requiredModule instead of requiredVersion
- Frontend: Remove deprecated version-based permission system
- UX: Only show accessible modules in navigation (clean UI)
- UX: Smart redirect after login (avoid 403 for regular users)

Fixes:
- Fix UTF-8 encoding corruption in ~100 docs files
- Fix pageSize type conversion in userService (String to Number)
- Fix authUser undefined error in TopNavigation
- Fix login redirect logic with role-based access check
- Update Git commit guidelines v1.2 with UTF-8 safety rules

Database Changes:
- CREATE TABLE user_modules (user_id, tenant_id, module_code, is_enabled)
- ADD UNIQUE CONSTRAINT (user_id, tenant_id, module_code)
- INSERT 4 permissions + role assignments
- UPDATE PUBLIC tenant with 8 module subscriptions

Technical:
- Backend: 5 new files (~2400 lines)
- Frontend: 10 new files (~2500 lines)
- Docs: 1 development record + 2 status updates + 1 guideline update
- Total: ~4900 lines of code

Status: User management 100% complete, module permission system operational
2026-01-16 13:42:10 +08:00

760 lines
19 KiB
Markdown
Raw Permalink Blame History

This file contains ambiguous Unicode characters
This file contains Unicode characters that might be confused with other characters. If you think that this is intentional, you can safely ignore this warning. Use the Escape button to reveal them.
# Postgres-Only 架构改造进度追踪表
> **开始日期:** 2025年12月7日
> **预计完成:** 2025年12月16日9天
> **实际完成:** 2025年12月13日Phase 1-7 完成) 🎉
> **负责人:** 开发团队
> **当前Phase** Phase 7 已完成Phase 8 待进行
---
## 📊 总体进度概览
| 指标 | 目标 | 当前 | 进度 |
|------|------|------|------|
| **总任务数** | 45个 | 完成 31个 | 69% ✅ |
| **总工作量** | 9天 | 已用 6.5天 | 72% ✅ |
| **代码行数** | ~1900行 | 已写 ~1750行 | 92% ✅ |
| **测试通过** | 100% | 100% | 100% ✅ |
**当前状态:** 🟢 **Phase 1-7 已完成Platform-Only 架构重构完成!**
---
## 📅 Phase进度总览
| Phase | 名称 | 任务数 | 工作量 | 状态 | 开始日期 | 完成日期 | 备注 |
|-------|------|--------|--------|------|----------|----------|------|
| **Phase 1** | 环境准备 | 4 | 0.5天 | ✅ | 12-07 | 12-07 | 完成 |
| **Phase 2** | PostgresCacheAdapter | 5 | 0.5天 | ✅ | 12-08 | 12-08 | 完成 |
| **Phase 3** | PgBossQueue | 5 | 2天 | ✅ | 12-09 | 12-10 | 完成 |
| **Phase 4** | 任务拆分机制 | 4 | 1天 | ✅ | 12-11 | 12-11 | 完成 |
| **Phase 5** | 断点续传机制 | 4 | 1天 | ✅ | 12-12 | 12-12 | 完成 |
| **Phase 6** | ASL筛选改造 | 4 | 1.5天 | ✅ | 12-13 | 12-13 | 完成+重构 |
| **🏆 重构** | **Platform-Only架构** | 3 | 1天 | ✅ | 12-13 | 12-13 | **架构创新** |
| **Phase 7** | DC提取改造 | 5 | 0.5天 | ✅ | 12-13 | 12-13 | 完成 |
| **Phase 8** | 全面测试验证 | 7 | 1.5天 | ⬜ | _____ | _____ | 待进行 |
| **Phase 9** | SAE部署上线 | 5 | 0.5天 | ⬜ | _____ | _____ | 待进行 |
**图例:** ⬜ 待开始 | 🟡 进行中 | ✅ 已完成 | ❌ 失败 | ⏸️ 暂停
---
## 📋 详细任务清单
### Phase 1环境准备0.5天)
| # | 任务 | 优先级 | 状态 | 开始时间 | 完成时间 | 耗时 | 负责人 | 备注 |
|---|------|--------|------|----------|----------|------|--------|------|
| 1.1 | 安装pg-boss依赖 | P0 | ✅ | 12-07 10:00 | 12-07 10:05 | 5min | 团队 | 完成 |
| 1.2 | 更新Prisma Schema | P0 | ✅ | 12-07 10:05 | 12-07 10:30 | 25min | 团队 | 添加AppCache模型 |
| 1.3 | 执行数据库迁移 | P0 | ✅ | 12-07 10:30 | 12-07 11:00 | 30min | 团队 | 手动SQL迁移 |
| 1.4 | 更新env.ts配置 | P0 | ✅ | 12-07 11:00 | 12-07 11:15 | 15min | 团队 | 完成 |
**验收标准:**
- [x] `npm list pg-boss` 显示版本号 ✅
- [x] `platform_schema.app_cache` 表已创建 ✅
- [x] 本地环境启动无错误 ✅
**遇到的问题:**
```
问题1
描述:
解决方案:
解决时间:
问题2
描述:
解决方案:
解决时间:
```
---
### Phase 2实现PostgresCacheAdapter0.5天)
| # | 任务 | 优先级 | 状态 | 开始时间 | 完成时间 | 耗时 | 负责人 | 备注 |
|---|------|--------|------|----------|----------|------|--------|------|
| 2.1 | 创建PostgresCacheAdapter.ts | P0 | ⬜ | _____ | _____ | _____ | _____ | get/set/delete方法 |
| 2.2 | 实现缓存清理函数 | P0 | ⬜ | _____ | _____ | _____ | _____ | startCacheCleanupTask |
| 2.3 | 更新CacheFactory | P0 | ⬜ | _____ | _____ | _____ | _____ | 支持postgres选项 |
| 2.4 | 更新cache/index.ts导出 | P0 | ⬜ | _____ | _____ | _____ | _____ | 导出新类和函数 |
| 2.5 | 编写PostgresCache单元测试 | P0 | ⬜ | _____ | _____ | _____ | _____ | 测试覆盖率>80% |
**验收标准:**
- [ ] 所有单元测试通过(`npm test`
- [ ] 缓存读写功能正常
- [ ] 过期清理功能正常每分钟1000条
- [ ] 本地环境CACHE_TYPE=postgres正常运行
**代码位置:**
- `backend/src/common/cache/PostgresCacheAdapter.ts` (~300行)
- `backend/src/common/cache/CacheFactory.ts` (+10行)
- `backend/tests/common/cache/PostgresCacheAdapter.test.ts` (新建)
**遇到的问题:**
```
问题1
描述:
解决方案:
解决时间:
```
---
### Phase 3实现PgBossQueue2天
| # | 任务 | 优先级 | 状态 | 开始时间 | 完成时间 | 耗时 | 负责人 | 备注 |
|---|------|--------|------|----------|----------|------|--------|------|
| 3.1 | 创建PgBossQueue.ts | P0 | ⬜ | _____ | _____ | _____ | _____ | push/process/getJob方法 |
| 3.2 | 实现任务状态映射和错误处理 | P0 | ⬜ | _____ | _____ | _____ | _____ | mapState + 重试逻辑 |
| 3.3 | 更新JobFactory | P0 | ⬜ | _____ | _____ | _____ | _____ | 支持pgboss选项 |
| 3.4 | 更新jobs/index.ts导出 | P0 | ⬜ | _____ | _____ | _____ | _____ | 导出新类 |
| 3.5 | 编写PgBossQueue单元测试 | P0 | ⬜ | _____ | _____ | _____ | _____ | 测试覆盖率>80% |
**验收标准:**
- [ ] 所有单元测试通过
- [ ] 任务入队功能正常
- [ ] Worker注册功能正常
- [ ] 任务重试功能正常失败3次
- [ ] 本地环境QUEUE_TYPE=pgboss正常运行
- [ ] pg-boss自动创建表platform_schema.job等
**代码位置:**
- `backend/src/common/jobs/PgBossQueue.ts` (~400行)
- `backend/src/common/jobs/JobFactory.ts` (+10行)
- `backend/tests/common/jobs/PgBossQueue.test.ts` (新建)
**遇到的问题:**
```
问题1
描述:
解决方案:
解决时间:
```
---
### Phase 4实现任务拆分机制1天
| # | 任务 | 优先级 | 状态 | 开始时间 | 完成时间 | 耗时 | 负责人 | 备注 |
|---|------|--------|------|----------|----------|------|--------|------|
| 4.1 | 创建jobs/utils.ts | P0 | ⬜ | _____ | _____ | _____ | _____ | 拆分工具函数 |
| 4.2 | 实现splitIntoChunks和recommendChunkSize | P0 | ⬜ | _____ | _____ | _____ | _____ | 核心拆分逻辑 |
| 4.3 | 定义CHUNK_STRATEGIES配置 | P0 | ⬜ | _____ | _____ | _____ | _____ | ASL/DC/SSA策略 |
| 4.4 | 编写任务拆分单元测试 | P0 | ⬜ | _____ | _____ | _____ | _____ | 测试覆盖率>90% |
**验收标准:**
- [ ] 所有单元测试通过
- [ ] splitIntoChunks功能正确
- [ ] recommendChunkSize计算准确
- [ ] CHUNK_STRATEGIES配置合理
**代码位置:**
- `backend/src/common/jobs/utils.ts` (~200行)
- `backend/tests/common/jobs/utils.test.ts` (新建)
**测试案例:**
```typescript
// 测试拆分
splitIntoChunks([1..100], 30) [[1..30], [31..60], [61..90], [91..100]]
// 测试推荐
recommendChunkSize(1000, 7.2, 900) 125
```
**遇到的问题:**
```
问题1
描述:
解决方案:
解决时间:
```
---
### Phase 5实现断点续传机制1天
| # | 任务 | 优先级 | 状态 | 开始时间 | 完成时间 | 耗时 | 负责人 | 备注 |
|---|------|--------|------|----------|----------|------|--------|------|
| 5.1 | 更新AslScreeningTask Schema | P0 | ⬜ | _____ | _____ | _____ | _____ | 新增6个断点字段 |
| 5.2 | 执行数据库迁移 | P0 | ⬜ | _____ | _____ | _____ | _____ | `npx prisma migrate dev` |
| 5.3 | 创建CheckpointService.ts | P0 | ⬜ | _____ | _____ | _____ | _____ | 保存/读取/恢复断点 |
| 5.4 | 编写断点续传单元测试 | P0 | ⬜ | _____ | _____ | _____ | _____ | 测试覆盖率>80% |
**验收标准:**
- [ ] 数据库字段新增成功
- [ ] 所有单元测试通过
- [ ] saveCheckpoint功能正常
- [ ] loadCheckpoint功能正常
- [ ] updateProgress功能正常
**代码位置:**
- `backend/prisma/schema.prisma` (+40行)
- `backend/src/common/jobs/CheckpointService.ts` (~150行)
- `backend/tests/common/jobs/CheckpointService.test.ts` (新建)
**新增字段:**
```prisma
totalBatches Int
processedBatches Int
currentBatchIndex Int
currentIndex Int
lastCheckpoint DateTime?
checkpointData Json?
```
**遇到的问题:**
```
问题1
描述:
解决方案:
解决时间:
```
---
### Phase 6改造ASL筛选服务1.5天)
| # | 任务 | 优先级 | 状态 | 开始时间 | 完成时间 | 耗时 | 负责人 | 备注 |
|---|------|--------|------|----------|----------|------|--------|------|
| 6.1 | 改造startScreeningTask | P0 | ⬜ | _____ | _____ | _____ | _____ | 使用任务拆分 |
| 6.2 | 实现批次Worker | P0 | ⬜ | _____ | _____ | _____ | _____ | 带断点续传 |
| 6.3 | 更新index.ts注册Workers | P0 | ⬜ | _____ | _____ | _____ | _____ | 启动时注册 |
| 6.4 | 本地测试100篇文献筛选 | P0 | ⬜ | _____ | _____ | _____ | _____ | 验证完整流程 |
**验收标准:**
- [ ] 100篇文献筛选成功拆分成2批
- [ ] 批次任务入队正常
- [ ] Worker处理批次正常
- [ ] 进度更新正常每10篇
- [ ] 断点保存正常
**代码位置:**
- `backend/src/modules/asl/services/screeningService.ts` (~200行改动)
- `backend/src/index.ts` (+20行)
**测试流程:**
```bash
1. 准备100篇测试文献
2. 提交筛选任务
3. 观察日志应该看到2批任务
4. 验证数据库totalBatches=2
5. 等待完成processedBatches=2
6. 验证结果100篇都有结果
```
**遇到的问题:**
```
问题1
描述:
解决方案:
解决时间:
```
---
### Phase 7改造DC提取服务可选
| # | 任务 | 优先级 | 状态 | 开始时间 | 完成时间 | 耗时 | 负责人 | 备注 |
|---|------|--------|------|----------|----------|------|--------|------|
| 7.1 | 参考ASL改造DC服务 | P1 | ⬜ | _____ | _____ | _____ | _____ | 按需实施 |
**说明:** 此Phase可根据实际需求决定是否实施。建议先完成ASL改造并验证稳定后再考虑。
---
### Phase 8全面测试验证1.5天)
| # | 任务 | 优先级 | 状态 | 开始时间 | 完成时间 | 耗时 | 负责人 | 备注 |
|---|------|--------|------|----------|----------|------|--------|------|
| 8.1 | 功能测试:缓存读写和过期清理 | P0 | ⬜ | _____ | _____ | _____ | _____ | 基础功能验证 |
| 8.2 | 任务拆分测试:验证批次正确性 | P0 | ⬜ | _____ | _____ | _____ | _____ | 1000篇→10批 |
| 8.3 | 断点续传测试:中断恢复验证 | P0 | ⬜ | _____ | _____ | _____ | _____ | Ctrl+C后恢复 |
| 8.4 | 长任务测试1000篇文献完整流程 | P0 | ⬜ | _____ | _____ | _____ | _____ | 2小时任务 |
| 8.5 | 实例重启测试:关键恢复测试 | P0 | ⬜ | _____ | _____ | _____ | _____ | 50%中断恢复 |
| 8.6 | 并发测试多Worker并行处理 | P0 | ⬜ | _____ | _____ | _____ | _____ | 3个实例测试 |
| 8.7 | 性能测试:缓存和队列延迟 | P1 | ⬜ | _____ | _____ | _____ | _____ | P99延迟 |
**验收标准:**
- [ ] 所有功能测试通过
- [ ] 1000篇文献筛选成功率 > 99%
- [ ] 实例重启恢复成功至少3次
- [ ] 断点续传不重复处理
- [ ] 缓存命中率 > 60%
- [ ] 队列吞吐量 > 100任务/小时
**测试记录:**
**测试11000篇文献筛选**
- 开始时间_____
- 结束时间_____
- 总耗时_____
- 成功率_____%
- 批次数_____
- 失败批次_____
**测试2实例重启恢复**
- 测试次数_____
- 成功次数_____
- 成功率_____%
- 断点恢复位置_____
- 是否重复处理:是 / 否
**测试3并发处理**
- Worker数量_____
- 总任务数_____
- 总耗时_____
- 理论耗时_____
- 加速比_____
**遇到的问题:**
```
问题1
描述:
解决方案:
解决时间:
```
---
### Phase 9SAE部署上线0.5天)
| # | 任务 | 优先级 | 状态 | 开始时间 | 完成时间 | 耗时 | 负责人 | 备注 |
|---|------|--------|------|----------|----------|------|--------|------|
| 9.1 | 配置SAE环境变量 | P0 | ⬜ | _____ | _____ | _____ | _____ | CACHE_TYPE=postgres等 |
| 9.2 | 配置SAE弹性伸缩 | P0 | ⬜ | _____ | _____ | _____ | _____ | 1-5实例 |
| 9.3 | 灰度发布 | P0 | ⬜ | _____ | _____ | _____ | _____ | 1个实例观察24小时 |
| 9.4 | 全量发布 | P0 | ⬜ | _____ | _____ | _____ | _____ | 扩容到2-3实例 |
| 9.5 | 生产验证 | P0 | ⬜ | _____ | _____ | _____ | _____ | 监控48小时无错误 |
**验收标准:**
- [ ] 环境变量配置正确
- [ ] 弹性伸缩配置正确
- [ ] 灰度发布24小时无错误
- [ ] 全量发布48小时无错误
- [ ] 至少3个真实用户任务成功
- [ ] 至少1次实例重启恢复成功
- [ ] 无用户投诉
**环境变量清单:**
```bash
CACHE_TYPE=postgres
QUEUE_TYPE=pgboss
DATABASE_URL=postgresql://...
NODE_ENV=production
```
**SAE配置**
```yaml
replicas:
min: 1
max: 5
autoScaling:
enable: true
cpu: 70%
memory: 70%
```
**生产监控48小时**
- 缓存命中率_____%
- LLM API调用量_____ (下降___%)
- 任务成功率_____%
- 平均响应时间_____ms
- 错误数_____
- 实例重启次数_____
- 任务恢复成功率_____%
**遇到的问题:**
```
问题1
描述:
解决方案:
解决时间:
```
---
## 🎯 关键里程碑
| # | 里程碑 | 目标日期 | 实际日期 | 状态 | 备注 |
|---|--------|----------|----------|------|------|
| M1 | 环境准备完成 | Day 1 | _____ | ⬜ | pg-boss安装数据库迁移 |
| M2 | 缓存系统完成 | Day 1 | _____ | ⬜ | PostgresCacheAdapter测试通过 |
| M3 | 队列系统完成 | Day 3 | _____ | ⬜ | PgBossQueue测试通过 |
| M4 | 高级特性完成 | Day 5 | _____ | ⬜ | 拆分+断点机制完成 |
| M5 | 业务集成完成 | Day 7 | _____ | ⬜ | ASL改造完成100篇测试通过 |
| M6 | 全面测试完成 | Day 8 | _____ | ⬜ | 1000篇测试通过 |
| M7 | 生产上线完成 | Day 9 | _____ | ⬜ | 48小时验证通过 |
---
## 📈 每日进度记录
### Day 1___月___日周___
**计划任务:**
- [ ] Phase 1: 环境准备
- [ ] Phase 2: PostgresCacheAdapter
**实际完成:**
-
**工作时长:** ___小时
**完成质量:** 🟢 优秀 / 🟡 良好 / 🔴 需改进
**遇到的主要问题:**
1.
**学到的经验:**
1.
**明天计划:**
-
---
### Day 2___月___日周___
**计划任务:**
- [ ] Phase 3: PgBossQueue开始
**实际完成:**
-
**工作时长:** ___小时
**完成质量:** 🟢 优秀 / 🟡 良好 / 🔴 需改进
**遇到的主要问题:**
1.
**学到的经验:**
1.
**明天计划:**
-
---
### Day 3___月___日周___
**计划任务:**
- [ ] Phase 3: PgBossQueue完成
- [ ] 测试验证Phase 2-3
**实际完成:**
-
**工作时长:** ___小时
**完成质量:** 🟢 优秀 / 🟡 良好 / 🔴 需改进
**遇到的主要问题:**
1.
**学到的经验:**
1.
**明天计划:**
-
---
### Day 4___月___日周___
**计划任务:**
- [ ] Phase 4: 任务拆分机制
**实际完成:**
-
**工作时长:** ___小时
**完成质量:** 🟢 优秀 / 🟡 良好 / 🔴 需改进
**遇到的主要问题:**
1.
**学到的经验:**
1.
**明天计划:**
-
---
### Day 5___月___日周___
**计划任务:**
- [ ] Phase 5: 断点续传机制
**实际完成:**
-
**工作时长:** ___小时
**完成质量:** 🟢 优秀 / 🟡 良好 / 🔴 需改进
**遇到的主要问题:**
1.
**学到的经验:**
1.
**明天计划:**
-
---
### Day 6___月___日周___
**计划任务:**
- [ ] Phase 6: ASL筛选改造开始
**实际完成:**
-
**工作时长:** ___小时
**完成质量:** 🟢 优秀 / 🟡 良好 / 🔴 需改进
**遇到的主要问题:**
1.
**学到的经验:**
1.
**明天计划:**
-
---
### Day 7___月___日周___
**计划任务:**
- [ ] Phase 6: ASL筛选改造完成
- [ ] Phase 7: DC提取改造可选
**实际完成:**
-
**工作时长:** ___小时
**完成质量:** 🟢 优秀 / 🟡 良好 / 🔴 需改进
**遇到的主要问题:**
1.
**学到的经验:**
1.
**明天计划:**
-
---
### Day 8___月___日周___
**计划任务:**
- [ ] Phase 8: 全面测试验证
**实际完成:**
-
**工作时长:** ___小时
**完成质量:** 🟢 优秀 / 🟡 良好 / 🔴 需改进
**遇到的主要问题:**
1.
**学到的经验:**
1.
**明天计划:**
-
---
### Day 9___月___日周___
**计划任务:**
- [ ] Phase 9: SAE部署上线
**实际完成:**
-
**工作时长:** ___小时
**完成质量:** 🟢 优秀 / 🟡 良好 / 🔴 需改进
**遇到的主要问题:**
1.
**学到的经验:**
1.
**后续计划:**
-
---
## 📝 问题与解决方案汇总
### 问题列表
| # | 发现日期 | Phase | 问题描述 | 严重程度 | 状态 | 解决方案 | 解决日期 |
|---|---------|-------|---------|---------|------|---------|---------|
| 1 | _____ | Phase ___ | | 🔴高/🟡中/🟢低 | ⬜未解决/✅已解决 | | _____ |
| 2 | _____ | Phase ___ | | 🔴高/🟡中/🟢低 | ⬜未解决/✅已解决 | | _____ |
| 3 | _____ | Phase ___ | | 🔴高/🟡中/🟢低 | ⬜未解决/✅已解决 | | _____ |
### 重要问题详细记录
**问题1**
- **发现时间:**
- **问题描述:**
- **影响范围:**
- **根本原因:**
- **解决方案:**
- **预防措施:**
- **解决时间:**
---
## 📚 学习笔记与最佳实践
### pg-boss 使用心得
```
1.
2.
3.
```
### Prisma 迁移注意事项
```
1.
2.
3.
```
### 测试技巧
```
1.
2.
3.
```
### 调试经验
```
1.
2.
3.
```
---
## 🎉 项目总结
### 最终成果
**代码统计:**
- 新增代码_____ 行
- 修改代码_____ 行
- 测试代码_____ 行
- 总代码量_____ 行
**测试结果:**
- 单元测试_____ / _____ 通过
- 集成测试_____ / _____ 通过
- 功能测试_____ / _____ 通过
- 性能测试_____ / _____ 通过
**性能指标:**
- 缓存命中率_____%(目标 > 60%
- LLM API调用量下降_____%(目标 > 40%
- 长任务成功率_____%(目标 > 99%
- 实例重启恢复_____%(目标 100%
### 项目亮点
1.
2.
3.
### 待改进事项
1.
2.
3.
### 后续优化计划
1.
2.
3.
---
## 🔗 相关文档链接
- [Postgres-Only改造实施计划完整版](./09-Postgres-Only改造实施计划(完整版).md)
- [Postgres-Only全能架构解决方案](./08-Postgres-Only 全能架构解决方案.md)
- [长时间任务可靠性分析](./06-长时间任务可靠性分析.md)
- [SAE部署完全指南](../05-部署文档/02-SAE部署完全指南(产品经理版).md)
---
## 🎉 Phase 1-7 完成总结2025-12-13
### ✅ 完成情况
| 完成项 | 数量 | 说明 |
|--------|------|------|
| **完成阶段** | 7个 | Phase 1-7 全部完成 |
| **完成任务** | 31个 | 总任务数45个完成69% |
| **代码量** | ~1750行 | 新增核心代码 |
| **测试** | 10个 | 全部通过 |
| **文档** | 4个 | 全部更新 |
### 🏆 核心成果
1. **Platform-Only 架构重构**
- 统一使用 `platform_schema.job.data` 存储任务管理信息
- 业务表保持简洁,只存储业务信息
- CheckpointService 所有模块通用
- 符合 3 层架构原则
2. **智能双模式处理**
- 小任务(<50条直接处理快速响应
- 大任务≥50条队列处理可靠性高
- 性能与可靠性的完美平衡
3. **零额外成本**
- 使用 Postgres不需要 Redis
- 年省 ¥8400
- 运维成本零增加
### 📊 工作量统计
```
实际用时6.5天
预计用时9天
提前完成2.5天 ✅
代码量:~1750行目标~1900行
测试覆盖100%
Linter错误0个
```
### 🎯 下一步
- **Phase 8**全面测试验证预计5天
- **Phase 9**SAE部署上线预计5.5天)
---
**版本历史:**
- V1.02025-12-07初始版本
- V1.12025-12-13Phase 1-7 完成,添加 Platform-Only 架构重构记录