|
|
b47079b387
|
feat(iit): Phase 1.5 AI对话集成REDCap真实数据完成
- feat: ChatService集成DeepSeek-V3实现AI对话(390行)
- feat: SessionMemory实现上下文记忆(最近3轮对话,170行)
- feat: 意图识别支持REDCap数据查询(关键词匹配)
- feat: REDCap数据注入LLM(queryRedcapRecord, countRedcapRecords, getProjectInfo)
- feat: 解决LLM幻觉问题(基于真实数据回答,明确system prompt)
- feat: 即时反馈(正在查询...提示)
- test: REDCap查询测试通过(test0102项目,10条记录,ID 7患者详情)
- docs: 创建Phase1.5开发完成记录(313行)
- docs: 更新Phase1.5开发计划(标记完成)
- docs: 更新MVP开发任务清单(Phase 1.5完成)
- docs: 更新模块当前状态(60%完成度)
- docs: 更新系统总体设计文档(v2.6)
- chore: 删除测试脚本(test-redcap-query-for-ai.ts, check-env-config.ts)
- chore: 移除REDCap测试环境变量(REDCAP_TEST_*)
技术亮点:
- AI基于REDCap真实数据对话,不编造信息
- 从数据库读取项目配置,不使用环境变量
- 企业微信端测试通过,用户体验良好
测试通过:
- 查询项目记录总数(10条)
- 查询特定患者详情(ID 7)
- 项目信息查询
- 上下文记忆(3轮对话)
- 即时反馈提示
影响范围:IIT Manager Agent模块
|
2026-01-03 22:48:10 +08:00 |
|
|
|
6a567f028f
|
feat(iit-manager): 完成MVP闭环 - 企业微信集成与端到端测试
核心交付物:
- WechatService (314行): Access Token缓存 + 消息推送
- WechatCallbackController (501行): URL验证 + 消息接收
- 质控Worker完善: 质控逻辑 + 企业微信推送 + 审计日志
- Worker注册修复: initIitManager() 在启动时调用
- 数据库字段修复: action -> action_type
- 端到端测试通过: <2秒延迟, 100%成功率
性能指标:
- Webhook响应: 5.8ms (目标<10ms)
- Worker执行: ~50ms (目标<100ms)
- 端到端延迟: <2秒 (目标<5秒)
- 消息成功率: 100% (测试5次)
临时措施:
- UserID从环境变量获取 (Phase 2改进)
- 定时轮询暂时禁用 (Phase 2添加)
- 质控逻辑简化 (Phase 1.5集成Dify)
Closes #IIT-MVP-Day3
|
2026-01-03 14:19:08 +08:00 |
|
|
|
36ce1bbcb2
|
feat(iit): Complete Day 3 - WeChat Work integration and URL verification
Summary:
- Implement WechatService (314 lines, push notifications)
- Implement WechatCallbackController (501 lines, async reply mode)
- Complete iit_quality_check Worker with WeChat notifications
- Configure WeChat routes (GET + POST /wechat/callback)
- Configure natapp tunnel for local development
- WeChat URL verification test passed
Technical Highlights:
- Async reply mode to avoid 5-second timeout
- Message encryption/decryption using @wecom/crypto
- Signature verification using getSignature
- natapp tunnel: https://iit.nat100.top
- Environment variables configuration completed
Technical Challenges Solved:
- Fix environment variable naming (WECHAT_CORP_SECRET)
- Fix @wecom/crypto import (createRequire for CommonJS)
- Fix decrypt function parameters (2 params, not 4)
- Fix Token character recognition (lowercase l vs digit 1)
- Regenerate EncodingAESKey (43 chars, correct format)
- Configure natapp for internal network penetration
Test Results:
- WeChat developer tool verification: PASSED
- Return status: request success
- HTTP 200, decrypted 23 characters correctly
- Backend logs: URL verification successful
Documentation:
- Add Day3 WeChat integration development record
- Update MVP development task list (Day 2-3 completed)
- Update module status guide (v1.2 -> v1.3)
- Overall completion: 35% -> 50%
Progress:
- Module completion: 35% -> 50%
- Day 3 development: COMPLETED
- Ready for end-to-end testing (REDCap -> WeChat)
|
2026-01-03 00:13:36 +08:00 |
|
|
|
dac3cecf78
|
feat(iit): Complete IIT Manager Agent Day 1 - Environment initialization and WeChat integration
Summary:
- Complete IIT Manager Agent MVP Day 1 (12.5% progress)
- Database: Create iit_schema with 5 tables (IitProject, IitPendingAction, IitTaskRun, IitUserMapping, IitAuditLog)
- Backend: Add module structure (577 lines) and types (223 lines)
- WeChat: Configure Enterprise WeChat app (CorpID, AgentID, Secret)
- WeChat: Obtain web authorization and JS-SDK authorization
- WeChat: Configure trusted domain (iit.xunzhengyixue.com)
- Frontend: Deploy v1.2 with WeChat domain verification file
- Frontend: Fix CRLF issue in docker-entrypoint.sh (CRLF -> LF)
- Testing: 11/11 database CRUD tests passed
- Testing: Access Token retrieval test passed
- Docs: Create module status and development guide
- Docs: Update MVP task list with Day 1 completion
- Docs: Rename deployment doc to SAE real-time status record
- Deployment: Update frontend internal IP to 172.17.173.80
Technical Details:
- Prisma: Multi-schema support (iit_schema)
- pg-boss: Job queue integration prepared
- Taro 4.x: Framework selected for WeChat Mini Program
- Shadow State: Architecture foundation laid
- Docker: Fix entrypoint script line endings for Linux container
Status: Day 1/14 complete, ready for Day 2 REDCap integration
|
2026-01-01 14:32:58 +08:00 |
|
|
|
4c5bb3d174
|
feat(iit): Initialize IIT Manager Agent MVP - Day 1 complete
- Add iit_schema with 5 tables
- Create module structure and types (223 lines)
- WeChat integration verified (Access Token success)
- Update system docs to v2.4
- Add REDCap source folders to .gitignore
- Day 1/14 complete (11/11 tasks)
|
2025-12-31 18:35:05 +08:00 |
|