Summary: - Implement Prompt management infrastructure and core services - Build admin portal frontend with light theme - Integrate CodeMirror 6 editor for non-technical users Phase 3.5.1: Infrastructure Setup - Create capability_schema for Prompt storage - Add prompt_templates and prompt_versions tables - Add prompt:view/edit/debug/publish permissions - Migrate RVW prompts to database (RVW_EDITORIAL, RVW_METHODOLOGY) Phase 3.5.2: PromptService Core - Implement gray preview logic (DRAFT for debuggers, ACTIVE for users) - Module-level debug control (setDebugMode) - Handlebars template rendering - Variable extraction and validation (extractVariables, validateVariables) - Three-level disaster recovery (database -> cache -> hardcoded fallback) Phase 3.5.3: Management API - 8 RESTful endpoints (/api/admin/prompts/*) - Permission control (PROMPT_ENGINEER can edit, SUPER_ADMIN can publish) Phase 3.5.4: Frontend Management UI - Build admin portal architecture (AdminLayout, OrgLayout) - Add route system (/admin/*, /org/*) - Implement PromptListPage (filter, search, debug switch) - Implement PromptEditor (CodeMirror 6 simplified for clinical users) - Implement PromptEditorPage (edit, save, publish, test, version history) Technical Details: - Backend: 6 files, ~2044 lines (prompt.service.ts 596 lines) - Frontend: 9 files, ~1735 lines (PromptEditorPage.tsx 399 lines) - CodeMirror 6: Line numbers, auto-wrap, variable highlight, search, undo/redo - Chinese-friendly: 15px font, 1.8 line-height, system fonts Next Step: Phase 3.5.5 - Integrate RVW module with PromptService Tested: Backend API tests passed (8/8), Frontend pending user testing Status: Ready for Phase 3.5.5 RVW integration
项目管理
用途: 项目进度跟踪、计划管理、决策记录
维护者: 项目管理组
最后更新: 2025-11-07
📋 目录结构
08-项目管理/
├── 01-整体开发计划/ # 长期规划(季度/年度)
│ └── README.md
├── 02-里程碑规划/ # 中期规划(周/月)
│ ├── README.md
│ ├── 04-里程碑4-架构改造.md
│ └── 05-里程碑5-ASL模块开发.md
├── 03-每周计划/ # 短期跟踪(日/周)
│ ├── README.md
│ └── 周次-进度报告模板.md
├── 04-决策记录/ # 重要决策归档(ADR)
│ ├── README.md
│ ├── ADR模板.md
│ └── ADR-001-Schema隔离暂缓执行.md
└── 下一阶段行动计划-ASL启动.md # 当前阶段行动计划 ⭐
🎯 当前阶段
下一阶段行动计划(2025-11-07 至 2025-12-06)
核心目标: Schema隔离 + 前端统一架构 + ASL核心功能
四周规划:
- Week 1: Schema隔离(3详细+7空)
- Week 2: 前端统一架构 + 后端分层 ⭐⭐⭐
- Week 3-4: ASL核心功能(4个LLM筛选)
- Week 5+: LLM网关统一 + 其他模块
当前版本: 下一阶段行动计划-V2.2-前端架构优先版.md ⭐⭐⭐
版本历史:
-
V2.2版(前端架构优先) - 2025-11-09 ⭐ 当前版本
- 核心调整:前端架构提前到Week 2,避免返工
- LLM网关推迟到Week 5,聚焦核心
- 4个LLM已配置(DeepSeek/GPT-5/Claude-4.5/Qwen)
-
V2.1版(务实版) - 2025-11-09
- 核心调整:3详细+7空Schema策略
- Just-in-time设计,避免过度设计
-
V2.0版(模块化架构优先) - 2025-11-07
- 核心调整:Schema隔离 + 独立部署架构
-
V1.0版(ASL启动) - 2025-11-06
- 初始版本:直接启动ASL开发
🚀 快速导航
我想...
📋 了解项目整体规划
→ 查看 整体开发计划
🎯 了解当前阶段要做什么
→ 查看 下一阶段行动计划-V2.2(前端架构优先版) ⭐⭐⭐
📊 查看本周要做什么
→ 查看 每周计划
🔍 了解某个决策为什么这样做
→ 查看 决策记录
维护者: 项目管理组
创建日期: 2025-11-06
最后更新: 2025-11-07