Files
AIclinicalresearch/docs/09-架构实施/数据库验证通过.md
HaHafeng 8eef9e0544 feat(asl): Complete Week 4 - Results display and Excel export with hybrid solution
Features:
- Backend statistics API (cloud-native Prisma aggregation)
- Results page with hybrid solution (AI consensus + human final decision)
- Excel export (frontend generation, zero disk write, cloud-native)
- PRISMA-style exclusion reason analysis with bar chart
- Batch selection and export (3 export methods)
- Fixed logic contradiction (inclusion does not show exclusion reason)
- Optimized table width (870px, no horizontal scroll)

Components:
- Backend: screeningController.ts - add getProjectStatistics API
- Frontend: ScreeningResults.tsx - complete results page (hybrid solution)
- Frontend: excelExport.ts - Excel export utility (40 columns full info)
- Frontend: ScreeningWorkbench.tsx - add navigation button
- Utils: get-test-projects.mjs - quick test tool

Architecture:
- Cloud-native: backend aggregation reduces network transfer
- Cloud-native: frontend Excel generation (zero file persistence)
- Reuse platform: global prisma instance, logger
- Performance: statistics API < 500ms, Excel export < 3s (1000 records)

Documentation:
- Update module status guide (add Week 4 features)
- Update task breakdown (mark Week 4 completed)
- Update API design spec (add statistics API)
- Update database design (add field usage notes)
- Create Week 4 development plan
- Create Week 4 completion report
- Create technical debt list

Test:
- End-to-end flow test passed
- All features verified
- Performance test passed
- Cloud-native compliance verified

Ref: Week 4 Development Plan
Scope: ASL Module MVP - Title Abstract Screening Results
Cloud-Native: Backend aggregation + Frontend Excel generation
2025-11-21 20:12:38 +08:00

2.0 KiB
Raw Blame History

数据库验证通过报告

验证时间: 2025-11-12
验证人: AI助手
状态: 全部通过


验证结果总结

1. Schema创建验证

10个Schema全部创建成功

Schema 表数量 状态
platform_schema 1
aia_schema 5
pkb_schema 5
asl_schema 0
common_schema 0
dc_schema 0
rvw_schema 0
admin_schema 0
ssa_schema 0
st_schema 0

2. 数据迁移验证

11个表100%完整迁移

所有表的数据量完全一致public vs 新Schema

  • users: 一致
  • projects: 一致
  • conversations: 一致
  • messages: 一致
  • general_conversations: 一致
  • general_messages: 一致
  • knowledge_bases: 一致
  • documents: 一致
  • batch_tasks: 一致
  • batch_results: 一致
  • task_templates: 一致

3. 外键约束验证

所有外键约束正确建立

  • platform_schema: 有外键约束
  • aia_schema: 有外键约束跨Schema引用
  • pkb_schema: 有外键约束跨Schema引用

4. 索引验证

所有索引正确创建

  • platform_schema: 索引已创建
  • aia_schema: 索引已创建
  • pkb_schema: 索引已创建

5. 跨Schema引用验证

所有跨Schema外键引用有效

  • aia_schema → platform_schema: 引用完整
  • pkb_schema → platform_schema: 引用完整
  • aia_schema内部引用: 完整
  • pkb_schema内部引用: 完整

🎯 验证结论

数据库迁移100%成功!

  • 10个Schema创建完整
  • 11个表数据迁移完整
  • 外键关系正确
  • 跨Schema引用有效
  • 无数据丢失
  • 无结构问题

可以安全进入下一步Prisma配置


验证时间: 2025-11-12
验证结果: 全部通过
下一步: 任务9 - Prisma多Schema配置