Commit Graph

6 Commits

Author SHA1 Message Date
f729699510 feat(dc): Complete Tool C quick action buttons Phase 1-2 - 7 functions
Summary:
- Implement 7 quick action functions (filter, recode, binning, conditional, dropna, compute, pivot)
- Refactor to pre-written Python functions architecture (stable and secure)
- Add 7 Python operations modules with full type hints
- Add 7 frontend Dialog components with user-friendly UI
- Fix NaN serialization issues and auto type conversion
- Update all related documentation

Technical Details:
- Python: operations/ module (filter.py, recode.py, binning.py, conditional.py, dropna.py, compute.py, pivot.py)
- Backend: QuickActionService.ts with 7 execute methods
- Frontend: 7 Dialog components with complete validation
- Toolbar: Enable 7 quick action buttons

Status: Phase 1-2 completed, basic testing passed, ready for further testing
2025-12-08 17:38:08 +08:00
af325348b8 feat(dc): Complete Tool C Day 5 - AI Chat + Ant Design X Integration
Summary:
- Upgrade to Ant Design 6.0.1 + install Ant Design X (2.1.0) + X SDK (2.1.0)
- Develop frontend common capability layer: Chat component library (~968 lines)
  * ChatContainer.tsx - Core container component
  * MessageRenderer.tsx - Message renderer
  * CodeBlockRenderer.tsx - Code block renderer with syntax highlighting
  * Complete TypeScript types and documentation
- Integrate ChatContainer into Tool C
- Fix 7 critical UI issues:
  * AG Grid module registration error
  * UI refinement (borders, shadows, gradients)
  * Add AI welcome message
  * Auto-clear input field after sending
  * Remove page scrollbars
  * Manual code execution (not auto-run)
  * Support simple Q&A (new /ai/chat API)
- Complete end-to-end testing
- Update all documentation (4 status docs + 6 dev logs)

Technical Stack:
- Frontend: React 19 + Ant Design 6.0 + Ant Design X 2.1
- Components: Bubble, Sender from @ant-design/x
- Total code: ~5418 lines

Status: Tool C MVP completed, production ready
2025-12-07 22:02:14 +08:00
2c7ed94161 feat(dc/tool-c): 完成前端基础框架(Day 4 MVP)
核心功能:
- 新增Tool C主入口(index.tsx, 258行):状态管理+布局
- 新增Header组件(91行):顶栏+返回按钮+导出
- 新增Toolbar组件(104行):7个快捷按钮+搜索框
- 新增DataGrid组件(111行):AG Grid Community集成
- 新增Sidebar组件(149行):右侧栏骨架版
- 新增API封装(toolC.ts, 218行):8个API方法
- 新增类型定义(types/index.ts, 62行)

AG Grid集成:
- 安装ag-grid-community + ag-grid-react
- Excel风格表格渲染
- 列排序、过滤、调整宽度
- 缺失值高亮显示(红色斜体)
- 数值右对齐
- 自定义Emerald绿色主题(ag-grid-custom.css, 113行)
- 虚拟滚动支持大数据

路由配置:
- 更新dc/index.tsx:新增ToolCModule懒加载
- 更新Portal.tsx:Tool C状态改为ready
- 路径:/data-cleaning/tool-c

API封装(8个方法):
- uploadFile(上传CSV/Excel)
- getSession(获取Session元数据)
- getPreviewData(获取预览数据)
- updateHeartbeat(延长10分钟)
- generateCode(生成代码,不执行)
- executeCode(执行代码)
- processMessage(生成+执行,一步到位)核心API
- getChatHistory(对话历史)

文档更新:
- 新增Day 4前端基础完成总结(213行)
- 更新工具C当前状态文档
- 更新TODO清单(Day 1-4标记完成)
- 更新系统总体设计文档

测试数据准备:
- cqol-demo.csv(21列x313行真实医疗数据)
- G鼓膜穿孔数据.xlsx(备用)

Day 5待完成:
- MessageItem组件(消息渲染)
- CodeBlock组件(Prism.js代码高亮)
- InputArea组件(输入框交互)
- InsightsPanel组件(数据洞察)
- 完善Sidebar(完整Chat交互)
- 端到端测试

影响范围:
- frontend-v2/src/modules/dc/pages/tool-c/*(新增11个文件)
- frontend-v2/src/modules/dc/api/toolC.ts(新增)
- frontend-v2/src/modules/dc/index.tsx(更新路由)
- frontend-v2/src/modules/dc/pages/Portal.tsx(启用Tool C)
- docs/03-业务模块/DC-数据清洗整理/*(文档更新)
- package.json(新增依赖)

Breaking Changes: 无

总代码行数:+1106行(前端基础框架)

Refs: #Tool-C-Day4
2025-12-07 17:40:07 +08:00
f01981bf78 feat(dc/tool-c): 完成AI代码生成服务(Day 3 MVP)
核心功能:
- 新增AICodeService(550行):AI代码生成核心服务
- 新增AIController(257行):4个API端点
- 新增dc_tool_c_ai_history表:存储对话历史
- 实现自我修正机制:最多3次智能重试
- 集成LLMFactory:复用通用能力层
- 10个Few-shot示例:覆盖Level 1-4场景

技术优化:
- 修复NaN序列化问题(Python端转None)
- 修复数据传递问题(从Session获取真实数据)
- 优化System Prompt(明确环境信息)
- 调整Few-shot示例(移除import语句)

测试结果:
- 通过率:9/11(81.8%) 达到MVP标准
- 成功场景:缺失值处理、编码、分箱、BMI、筛选、填补、统计、分类
- 待优化:数值清洗、智能去重(已记录技术债务TD-C-006)

API端点:
- POST /api/v1/dc/tool-c/ai/generate(生成代码)
- POST /api/v1/dc/tool-c/ai/execute(执行代码)
- POST /api/v1/dc/tool-c/ai/process(生成并执行,一步到位)
- GET /api/v1/dc/tool-c/ai/history/:sessionId(对话历史)

文档更新:
- 新增Day 3开发完成总结(770行)
- 新增复杂场景优化技术债务(TD-C-006)
- 更新工具C当前状态文档
- 更新技术债务清单

影响范围:
- backend/src/modules/dc/tool-c/*(新增2个文件,更新1个文件)
- backend/scripts/create-tool-c-ai-history-table.mjs(新增)
- backend/prisma/schema.prisma(新增DcToolCAiHistory模型)
- extraction_service/services/dc_executor.py(NaN序列化修复)
- docs/03-业务模块/DC-数据清洗整理/*(5份文档更新)

Breaking Changes: 无

总代码行数:+950行

Refs: #Tool-C-Day3
2025-12-07 16:21:32 +08:00
8a17369138 feat(dc): Complete Tool B MVP with full API integration and bug fixes
Phase 5: Export Feature
- Add Excel export API endpoint (GET /tasks/:id/export)
- Fix Content-Disposition header encoding for Chinese filenames
- Fix export field order to match template definition
- Export finalResult or resultA as fallback

API Integration Fixes (Phase 1-5):
- Fix API response parsing (return result.data consistently)
- Fix field name mismatch (fileKey -> sourceFileKey)
- Fix Excel parsing bug (range:99 -> slice(0,100))
- Add file upload with Excel parsing (columns, totalRows)
- Add detailed error logging for debugging

LLM Integration Fixes:
- Fix LLM call method: LLMFactory.createLLM -> getAdapter
- Fix adapter interface: generateText -> chat([messages])
- Fix response fields: text -> content, tokensUsed -> usage.totalTokens
- Fix model names: qwen-max -> qwen3-72b

React Infinite Loop Fixes:
- Step2: Remove updateState from useEffect deps
- Step3: Add useRef to prevent Strict Mode double execution
- Step3: Clear interval on API failure (max 3 retries)
- Step4: Add useRef to prevent infinite data loading
- Add cleanup functions to all useEffect hooks

Frontend Enhancements:
- Add comprehensive error handling with user-friendly messages
- Remove debug console.logs (production ready)
- Fix TypeScript type definitions (TaskProgress, ExtractionItem)
- Improve Step4Verify data transformation logic

Backend Enhancements:
- Add detailed logging at each step for debugging
- Add parameter validation in controllers
- Improve error messages with stack traces (dev mode)
- Add export field ordering by template definition

Documentation Updates:
- Update module status: Tool B MVP completed
- Create MVP completion summary (06-开发记录)
- Create technical debt document (07-技术债务)
- Update API documentation with test status
- Update database documentation with verified status
- Update system overview with DC module status
- Document 4 known issues (Excel preprocessing, progress display, etc.)

Testing Results:
- File upload: 9 rows parsed successfully
- Health check: Column validation working
- Dual model extraction: DeepSeek-V3 + Qwen-Max both working
- Processing time: ~49s for 9 records (~5s per record)
- Token usage: ~10k tokens total (~1.1k per record)
- Conflict detection: 1 clean, 8 conflicts (88.9% conflict rate)
- Excel export: Working with proper encoding

Files Changed:
Backend (~500 lines):
- ExtractionController.ts: Add upload endpoint, improve logging
- DualModelExtractionService.ts: Fix LLM call methods, add detailed logs
- HealthCheckService.ts: Fix Excel range parsing
- routes/index.ts: Add upload route

Frontend (~200 lines):
- toolB.ts: Fix API response parsing, add error handling
- Step1Upload.tsx: Integrate upload and health check APIs
- Step2Schema.tsx: Fix infinite loop, load templates from API
- Step3Processing.tsx: Fix infinite loop, integrate progress polling
- Step4Verify.tsx: Fix infinite loop, transform backend data correctly
- Step5Result.tsx: Integrate export API
- index.tsx: Add file metadata to state

Scripts:
- check-task-progress.mjs: Database inspection utility

Docs (~8 files):
- 00-模块当前状态与开发指南.md: Update to v2.0
- API设计文档.md: Mark all endpoints as tested
- 数据库设计文档.md: Update verification status
- DC模块Tool-B开发计划.md: Add MVP completion notice
- DC模块Tool-B开发任务清单.md: Update progress to 100%
- Tool-B-MVP完成总结.md: New completion summary
- Tool-B技术债务清单.md: New technical debt document
- 00-系统当前状态与开发指南.md: Update DC module status

Status: Tool B MVP complete and production ready
2025-12-03 15:07:39 +08:00
d4d33528c7 feat(dc): Complete Phase 1 - Portal workbench page development
Summary:
- Implement DC module Portal page with 3 tool cards
- Create ToolCard component with decorative background and hover animations
- Implement TaskList component with table layout and progress bars
- Implement AssetLibrary component with tab switching and file cards
- Complete database verification (4 tables confirmed)
- Complete backend API verification (6 endpoints ready)
- Optimize UI to match prototype design (V2.html)

Frontend Components (~715 lines):
- components/ToolCard.tsx - Tool cards with animations
- components/TaskList.tsx - Recent tasks table view
- components/AssetLibrary.tsx - Data asset library with tabs
- hooks/useRecentTasks.ts - Task state management
- hooks/useAssets.ts - Asset state management
- pages/Portal.tsx - Main portal page
- types/portal.ts - TypeScript type definitions

Backend Verification:
- Backend API: 1495 lines code verified
- Database: dc_schema with 4 tables verified
- API endpoints: 6 endpoints tested (templates API works)

Documentation:
- Database verification report
- Backend API test report
- Phase 1 completion summary
- UI optimization report
- Development task checklist
- Development plan for Tool B

Status: Phase 1 completed (100%), ready for browser testing
Next: Phase 2 - Tool B Step 1 and 2 development
2025-12-02 21:53:24 +08:00