Commit Graph

2 Commits

Author SHA1 Message Date
971e903acf chore(deploy): finalize 0309 SAE rollout updates
Sync deployment documentation to the final successful SAE state and clear pending deployment checklist items. Include backend/frontend/R hardening and diagnostics improvements required for stable production behavior.

Made-with: Cursor
2026-03-09 22:27:11 +08:00
5c5fec52c1 fix(aia,ssa,asl,infra): harden SSE transport and stabilize attachment context
Deliver SSE protocol hardening for SAE/HTTP2 paths, add graceful shutdown health behavior, and improve SSA retry UX for transient stream failures. For AIA, persist attachment extraction results in database with cache read-through fallback, plus production cache safety guard to prevent memory-cache drift in multi-instance deployments; also restore ASL SR page scrolling behavior.

Made-with: Cursor
2026-03-09 18:45:12 +08:00