Commit Graph

2 Commits

Author SHA1 Message Date
8be741cd52 docs(dc/tool-c): Complete Tool C MVP planning and TODO list
Summary:
- Update Tool C MVP Development Plan (V1.3)
  * Clarify Python execution as core feature
  * Add 15 real medical data cleaning scenarios (basic/medium/advanced)
  * Enhance System Prompt with 10 Few-shot examples
  * Discover existing Python service (extraction_service)
  * Update to extend existing service instead of rebuilding
- Create Tool C MVP Development TODO List
  * 3-week plan with 30 tasks (Day 1-15)
  * 4 core milestones with clear acceptance criteria
  * Daily checklist and risk management
  * Detailed task breakdown for each day

Key Changes:
- Python service: Extend existing extraction_service instead of new setup
- Test scenarios: 15 scenarios (5 basic + 5 medium + 5 advanced)
- Success criteria: Basic >90%, Medium >80%, Advanced >60%, Total >80%
- Development time: Reduced from 3 weeks to 2 weeks (reuse infrastructure)

Status: Planning complete, ready to start Day 1 development
2025-12-06 11:00:44 +08:00
5f1e7af92c feat(dc): Complete Tool B frontend development with UI optimization
- Implement Tool B 5-step workflow (upload, schema, processing, verify, result)
- Add back navigation button to Portal
- Optimize Step 2 field list styling to match prototype
- Fix step 3 label: 'dual-blind' to 'dual-model'
- Create API service layer with 7 endpoints
- Integrate Tool B route into DC module
- Add comprehensive TypeScript types

Components (~1100 lines):
- index.tsx: Main Tool B entry with state management
- Step1Upload.tsx: File upload and health check
- Step2Schema.tsx: Smart template configuration
- Step3Processing.tsx: Dual-model extraction progress
- Step4Verify.tsx: Conflict verification workbench
- Step5Result.tsx: Result display
- StepIndicator.tsx: Step progress component
- api/toolB.ts: API service layer

Status: Frontend complete, ready for API integration
2025-12-03 09:36:35 +08:00