Commit Graph

4 Commits

Author SHA1 Message Date
75ceeb0653 hotfix(dc/tool-c): Fix compute formula validation and binning NaN serialization
Critical fixes:
1. Compute column: Add Chinese comma support in formula validation
   - Problem: Formula with Chinese comma failed validation
   - Fix: Add Chinese comma character to allowed_chars regex
   - Example: Support formulas like 'col1(kg)+ col2,col3'

2. Binning operation: Fix NaN serialization error
   - Problem: 'Out of range float values are not JSON compliant: nan'
   - Fix: Enhanced NaN/inf handling in binning endpoint
   - Added np.inf/-np.inf replacement before JSON serialization
   - Added manual JSON serialization with NaN->null conversion

3. Enhanced all operation endpoints for consistency
   - Updated conditional, dropna endpoints with same NaN/inf handling
   - Ensures all operations return JSON-compliant data

Modified files:
- extraction_service/operations/compute.py: Add Chinese comma to regex
- extraction_service/main.py: Enhanced NaN handling in binning/conditional/dropna

Status: Hotfix complete, ready for testing
2025-12-09 08:45:27 +08:00
91cab452d1 fix(dc/tool-c): Fix special character handling and improve UX
Major fixes:
- Fix pivot transformation with special characters in column names
- Fix compute column validation for Chinese punctuation
- Fix recode dialog to fetch unique values from full dataset via new API
- Add column mapping mechanism to handle special characters

Database migration:
- Add column_mapping field to dc_tool_c_sessions table
- Migration file: 20251208_add_column_mapping

UX improvements:
- Darken table grid lines for better visibility
- Reduce column width by 40% with tooltip support
- Insert new columns next to source columns
- Preserve original row order after operations
- Add notice about 50-row preview limit

Modified files:
- Backend: SessionService, SessionController, QuickActionService, routes
- Python: pivot.py, compute.py, recode.py, binning.py, conditional.py
- Frontend: DataGrid, RecodeDialog, index.tsx, ag-grid-custom.css
- Database: schema.prisma, migration SQL

Status: Code complete, database migrated, ready for testing
2025-12-08 23:20:55 +08:00
f729699510 feat(dc): Complete Tool C quick action buttons Phase 1-2 - 7 functions
Summary:
- Implement 7 quick action functions (filter, recode, binning, conditional, dropna, compute, pivot)
- Refactor to pre-written Python functions architecture (stable and secure)
- Add 7 Python operations modules with full type hints
- Add 7 frontend Dialog components with user-friendly UI
- Fix NaN serialization issues and auto type conversion
- Update all related documentation

Technical Details:
- Python: operations/ module (filter.py, recode.py, binning.py, conditional.py, dropna.py, compute.py, pivot.py)
- Backend: QuickActionService.ts with 7 execute methods
- Frontend: 7 Dialog components with complete validation
- Toolbar: Enable 7 quick action buttons

Status: Phase 1-2 completed, basic testing passed, ready for further testing
2025-12-08 17:38:08 +08:00
af325348b8 feat(dc): Complete Tool C Day 5 - AI Chat + Ant Design X Integration
Summary:
- Upgrade to Ant Design 6.0.1 + install Ant Design X (2.1.0) + X SDK (2.1.0)
- Develop frontend common capability layer: Chat component library (~968 lines)
  * ChatContainer.tsx - Core container component
  * MessageRenderer.tsx - Message renderer
  * CodeBlockRenderer.tsx - Code block renderer with syntax highlighting
  * Complete TypeScript types and documentation
- Integrate ChatContainer into Tool C
- Fix 7 critical UI issues:
  * AG Grid module registration error
  * UI refinement (borders, shadows, gradients)
  * Add AI welcome message
  * Auto-clear input field after sending
  * Remove page scrollbars
  * Manual code execution (not auto-run)
  * Support simple Q&A (new /ai/chat API)
- Complete end-to-end testing
- Update all documentation (4 status docs + 6 dev logs)

Technical Stack:
- Frontend: React 19 + Ant Design 6.0 + Ant Design X 2.1
- Components: Bubble, Sender from @ant-design/x
- Total code: ~5418 lines

Status: Tool C MVP completed, production ready
2025-12-07 22:02:14 +08:00