Commit Graph

2 Commits

Author SHA1 Message Date
5f1e7af92c feat(dc): Complete Tool B frontend development with UI optimization
- Implement Tool B 5-step workflow (upload, schema, processing, verify, result)
- Add back navigation button to Portal
- Optimize Step 2 field list styling to match prototype
- Fix step 3 label: 'dual-blind' to 'dual-model'
- Create API service layer with 7 endpoints
- Integrate Tool B route into DC module
- Add comprehensive TypeScript types

Components (~1100 lines):
- index.tsx: Main Tool B entry with state management
- Step1Upload.tsx: File upload and health check
- Step2Schema.tsx: Smart template configuration
- Step3Processing.tsx: Dual-model extraction progress
- Step4Verify.tsx: Conflict verification workbench
- Step5Result.tsx: Result display
- StepIndicator.tsx: Step progress component
- api/toolB.ts: API service layer

Status: Frontend complete, ready for API integration
2025-12-03 09:36:35 +08:00
d4d33528c7 feat(dc): Complete Phase 1 - Portal workbench page development
Summary:
- Implement DC module Portal page with 3 tool cards
- Create ToolCard component with decorative background and hover animations
- Implement TaskList component with table layout and progress bars
- Implement AssetLibrary component with tab switching and file cards
- Complete database verification (4 tables confirmed)
- Complete backend API verification (6 endpoints ready)
- Optimize UI to match prototype design (V2.html)

Frontend Components (~715 lines):
- components/ToolCard.tsx - Tool cards with animations
- components/TaskList.tsx - Recent tasks table view
- components/AssetLibrary.tsx - Data asset library with tabs
- hooks/useRecentTasks.ts - Task state management
- hooks/useAssets.ts - Asset state management
- pages/Portal.tsx - Main portal page
- types/portal.ts - TypeScript type definitions

Backend Verification:
- Backend API: 1495 lines code verified
- Database: dc_schema with 4 tables verified
- API endpoints: 6 endpoints tested (templates API works)

Documentation:
- Database verification report
- Backend API test report
- Phase 1 completion summary
- UI optimization report
- Development task checklist
- Development plan for Tool B

Status: Phase 1 completed (100%), ready for browser testing
Next: Phase 2 - Tool B Step 1 and 2 development
2025-12-02 21:53:24 +08:00