5f1e7af92c
feat(dc): Complete Tool B frontend development with UI optimization
...
- Implement Tool B 5-step workflow (upload, schema, processing, verify, result)
- Add back navigation button to Portal
- Optimize Step 2 field list styling to match prototype
- Fix step 3 label: 'dual-blind' to 'dual-model'
- Create API service layer with 7 endpoints
- Integrate Tool B route into DC module
- Add comprehensive TypeScript types
Components (~1100 lines):
- index.tsx: Main Tool B entry with state management
- Step1Upload.tsx: File upload and health check
- Step2Schema.tsx: Smart template configuration
- Step3Processing.tsx: Dual-model extraction progress
- Step4Verify.tsx: Conflict verification workbench
- Step5Result.tsx: Result display
- StepIndicator.tsx: Step progress component
- api/toolB.ts: API service layer
Status: Frontend complete, ready for API integration
2025-12-03 09:36:35 +08:00
d4d33528c7
feat(dc): Complete Phase 1 - Portal workbench page development
...
Summary:
- Implement DC module Portal page with 3 tool cards
- Create ToolCard component with decorative background and hover animations
- Implement TaskList component with table layout and progress bars
- Implement AssetLibrary component with tab switching and file cards
- Complete database verification (4 tables confirmed)
- Complete backend API verification (6 endpoints ready)
- Optimize UI to match prototype design (V2.html)
Frontend Components (~715 lines):
- components/ToolCard.tsx - Tool cards with animations
- components/TaskList.tsx - Recent tasks table view
- components/AssetLibrary.tsx - Data asset library with tabs
- hooks/useRecentTasks.ts - Task state management
- hooks/useAssets.ts - Asset state management
- pages/Portal.tsx - Main portal page
- types/portal.ts - TypeScript type definitions
Backend Verification:
- Backend API: 1495 lines code verified
- Database: dc_schema with 4 tables verified
- API endpoints: 6 endpoints tested (templates API works)
Documentation:
- Database verification report
- Backend API test report
- Phase 1 completion summary
- UI optimization report
- Development task checklist
- Development plan for Tool B
Status: Phase 1 completed (100%), ready for browser testing
Next: Phase 2 - Tool B Step 1 and 2 development
2025-12-02 21:53:24 +08:00
e28617ab89
docs(asl): Add fulltext screening frontend development plan and technical debt
...
- Create comprehensive frontend development plan (05-全文复筛前端开发计划.md)
- 4 core pages design (Settings, Progress, Workbench, Results)
- 10 feature components and 3 reused components
- Detailed UI/UX specifications with wireframes
- 2.5-day development schedule (Day 6-8)
- Technical implementation guide (PDF upload, progress polling, PDF preview)
- Testing plan (functional, performance, compatibility)
- Update technical debt list (v1.1 -> v1.2)
- Add 10 frontend-related technical debts (debt 11-20)
- PDF annotation feature (medium priority)
- Literature note-taking (medium priority)
- Knowledge base integration (low priority)
- Auto-fetch PDF by PMID/DOI (low priority)
- Highlight AI-cited text in PDF (medium priority)
- WebSocket real-time push (low priority)
- Virtual scrolling optimization (low priority)
- Batch operations (low priority)
- Offline PDF preview (low priority)
- Mobile responsive design (lowest priority)
2025-11-23 11:17:33 +08:00