8be741cd52 docs(dc/tool-c): Complete Tool C MVP planning and TODO list
Summary:
- Update Tool C MVP Development Plan (V1.3)
  * Clarify Python execution as core feature
  * Add 15 real medical data cleaning scenarios (basic/medium/advanced)
  * Enhance System Prompt with 10 Few-shot examples
  * Discover existing Python service (extraction_service)
  * Update to extend existing service instead of rebuilding
- Create Tool C MVP Development TODO List
  * 3-week plan with 30 tasks (Day 1-15)
  * 4 core milestones with clear acceptance criteria
  * Daily checklist and risk management
  * Detailed task breakdown for each day

Key Changes:
- Python service: Extend existing extraction_service instead of new setup
- Test scenarios: 15 scenarios (5 basic + 5 medium + 5 advanced)
- Success criteria: Basic >90%, Medium >80%, Advanced >60%, Total >80%
- Development time: Reduced from 3 weeks to 2 weeks (reuse infrastructure)

Status: Planning complete, ready to start Day 1 development
2025-12-06 11:00:44 +08:00
d4d33528c7 feat(dc): Complete Phase 1 - Portal workbench page development
Summary:
- Implement DC module Portal page with 3 tool cards
- Create ToolCard component with decorative background and hover animations
- Implement TaskList component with table layout and progress bars
- Implement AssetLibrary component with tab switching and file cards
- Complete database verification (4 tables confirmed)
- Complete backend API verification (6 endpoints ready)
- Optimize UI to match prototype design (V2.html)

Frontend Components (~715 lines):
- components/ToolCard.tsx - Tool cards with animations
- components/TaskList.tsx - Recent tasks table view
- components/AssetLibrary.tsx - Data asset library with tabs
- hooks/useRecentTasks.ts - Task state management
- hooks/useAssets.ts - Asset state management
- pages/Portal.tsx - Main portal page
- types/portal.ts - TypeScript type definitions

Backend Verification:
- Backend API: 1495 lines code verified
- Database: dc_schema with 4 tables verified
- API endpoints: 6 endpoints tested (templates API works)

Documentation:
- Database verification report
- Backend API test report
- Phase 1 completion summary
- UI optimization report
- Development task checklist
- Development plan for Tool B

Status: Phase 1 completed (100%), ready for browser testing
Next: Phase 2 - Tool B Step 1 and 2 development