Commit Graph

3 Commits

Author SHA1 Message Date
38d9bf99d6 feat(redcap): REDCap 15.8.0 Docker本地开发环境部署完成
核心成果:
- REDCap 15.8.0成功部署在Docker环境
- 登录功能正常,管理员账户: Admin/Admin123!
- MySQL 8.0 + PHP 8.1 + Apache 2.4环境验证通过

问题解决:
1. 修复ERR_CONTENT_DECODING_FAILED错误
   - 强制禁用Apache deflate模块
   - PHP配置关闭zlib.output_compression
   - 自动注释REDCap源码中的压缩设置

2. 修复Base URL配置错误
   - 更新redcap_config表中的redcap_base_url
   - 统一DocumentRoot与访问路径

3. 修复登录失败问题(CRLF污染)
   - 删除database.php末尾的PHP结束标签
   - 创建.gitattributes规范换行符
   - 验证REDCap官方源码无此问题

技术改进:
- 添加密码重置工具脚本
- 完善docker-entrypoint.sh启动脚本
- 创建详细的部署问题解决记录
- 建立PHP配置文件最佳实践

部署文档:
- REDCap本地Docker开发环境部署方案
- REDCap生产环境部署决策报告(ECS vs SAE)
- 部署问题解决记录(含根因分析)

下一步:
- Day 2: 开发REDCap API Adapter
- 实现与IIT Manager Agent的数据对接
2026-01-02 10:02:46 +08:00
dac3cecf78 feat(iit): Complete IIT Manager Agent Day 1 - Environment initialization and WeChat integration
Summary:
- Complete IIT Manager Agent MVP Day 1 (12.5% progress)
- Database: Create iit_schema with 5 tables (IitProject, IitPendingAction, IitTaskRun, IitUserMapping, IitAuditLog)
- Backend: Add module structure (577 lines) and types (223 lines)
- WeChat: Configure Enterprise WeChat app (CorpID, AgentID, Secret)
- WeChat: Obtain web authorization and JS-SDK authorization
- WeChat: Configure trusted domain (iit.xunzhengyixue.com)
- Frontend: Deploy v1.2 with WeChat domain verification file
- Frontend: Fix CRLF issue in docker-entrypoint.sh (CRLF -> LF)
- Testing: 11/11 database CRUD tests passed
- Testing: Access Token retrieval test passed
- Docs: Create module status and development guide
- Docs: Update MVP task list with Day 1 completion
- Docs: Rename deployment doc to SAE real-time status record
- Deployment: Update frontend internal IP to 172.17.173.80

Technical Details:
- Prisma: Multi-schema support (iit_schema)
- pg-boss: Job queue integration prepared
- Taro 4.x: Framework selected for WeChat Mini Program
- Shadow State: Architecture foundation laid
- Docker: Fix entrypoint script line endings for Linux container

Status: Day 1/14 complete, ready for Day 2 REDCap integration
2026-01-01 14:32:58 +08:00
4c5bb3d174 feat(iit): Initialize IIT Manager Agent MVP - Day 1 complete
- Add iit_schema with 5 tables
- Create module structure and types (223 lines)
- WeChat integration verified (Access Token success)
- Update system docs to v2.4
- Add REDCap source folders to .gitignore
- Day 1/14 complete (11/11 tasks)
2025-12-31 18:35:05 +08:00