|
|
1b53ab9d52
|
feat(aia): Complete AIA V2.0 with universal streaming capabilities
Major Changes:
- Add StreamingService with OpenAI Compatible format
- Upgrade Chat component V2 with Ant Design X integration
- Implement AIA module with 12 intelligent agents
- Update API routes to unified /api/v1 prefix
- Update system documentation
Backend (~1300 lines):
- common/streaming: OpenAI Compatible adapter
- modules/aia: 12 agents, conversation service, streaming integration
- Update route versions (RVW, PKB to v1)
Frontend (~3500 lines):
- modules/aia: AgentHub + ChatWorkspace (100% prototype restoration)
- shared/Chat: AIStreamChat, ThinkingBlock, useAIStream Hook
- Update API endpoints to v1
Documentation:
- AIA module status guide
- Universal capabilities catalog
- System overview updates
- All module documentation sync
Tested: Stream response verified, authentication working
Status: AIA V2.0 core completed (85%)
|
2026-01-14 19:15:01 +08:00 |
|
|
|
d4d33528c7
|
feat(dc): Complete Phase 1 - Portal workbench page development
Summary:
- Implement DC module Portal page with 3 tool cards
- Create ToolCard component with decorative background and hover animations
- Implement TaskList component with table layout and progress bars
- Implement AssetLibrary component with tab switching and file cards
- Complete database verification (4 tables confirmed)
- Complete backend API verification (6 endpoints ready)
- Optimize UI to match prototype design (V2.html)
Frontend Components (~715 lines):
- components/ToolCard.tsx - Tool cards with animations
- components/TaskList.tsx - Recent tasks table view
- components/AssetLibrary.tsx - Data asset library with tabs
- hooks/useRecentTasks.ts - Task state management
- hooks/useAssets.ts - Asset state management
- pages/Portal.tsx - Main portal page
- types/portal.ts - TypeScript type definitions
Backend Verification:
- Backend API: 1495 lines code verified
- Database: dc_schema with 4 tables verified
- API endpoints: 6 endpoints tested (templates API works)
Documentation:
- Database verification report
- Backend API test report
- Phase 1 completion summary
- UI optimization report
- Development task checklist
- Development plan for Tool B
Status: Phase 1 completed (100%), ready for browser testing
Next: Phase 2 - Tool B Step 1 and 2 development
|
2025-12-02 21:53:24 +08:00 |
|