1b53ab9d52
feat(aia): Complete AIA V2.0 with universal streaming capabilities
...
Major Changes:
- Add StreamingService with OpenAI Compatible format
- Upgrade Chat component V2 with Ant Design X integration
- Implement AIA module with 12 intelligent agents
- Update API routes to unified /api/v1 prefix
- Update system documentation
Backend (~1300 lines):
- common/streaming: OpenAI Compatible adapter
- modules/aia: 12 agents, conversation service, streaming integration
- Update route versions (RVW, PKB to v1)
Frontend (~3500 lines):
- modules/aia: AgentHub + ChatWorkspace (100% prototype restoration)
- shared/Chat: AIStreamChat, ThinkingBlock, useAIStream Hook
- Update API endpoints to v1
Documentation:
- AIA module status guide
- Universal capabilities catalog
- System overview updates
- All module documentation sync
Tested: Stream response verified, authentication working
Status: AIA V2.0 core completed (85%)
2026-01-14 19:15:01 +08:00
f729699510
feat(dc): Complete Tool C quick action buttons Phase 1-2 - 7 functions
...
Summary:
- Implement 7 quick action functions (filter, recode, binning, conditional, dropna, compute, pivot)
- Refactor to pre-written Python functions architecture (stable and secure)
- Add 7 Python operations modules with full type hints
- Add 7 frontend Dialog components with user-friendly UI
- Fix NaN serialization issues and auto type conversion
- Update all related documentation
Technical Details:
- Python: operations/ module (filter.py, recode.py, binning.py, conditional.py, dropna.py, compute.py, pivot.py)
- Backend: QuickActionService.ts with 7 execute methods
- Frontend: 7 Dialog components with complete validation
- Toolbar: Enable 7 quick action buttons
Status: Phase 1-2 completed, basic testing passed, ready for further testing
2025-12-08 17:38:08 +08:00
8be741cd52
docs(dc/tool-c): Complete Tool C MVP planning and TODO list
...
Summary:
- Update Tool C MVP Development Plan (V1.3)
* Clarify Python execution as core feature
* Add 15 real medical data cleaning scenarios (basic/medium/advanced)
* Enhance System Prompt with 10 Few-shot examples
* Discover existing Python service (extraction_service)
* Update to extend existing service instead of rebuilding
- Create Tool C MVP Development TODO List
* 3-week plan with 30 tasks (Day 1-15)
* 4 core milestones with clear acceptance criteria
* Daily checklist and risk management
* Detailed task breakdown for each day
Key Changes:
- Python service: Extend existing extraction_service instead of new setup
- Test scenarios: 15 scenarios (5 basic + 5 medium + 5 advanced)
- Success criteria: Basic >90%, Medium >80%, Advanced >60%, Total >80%
- Development time: Reduced from 3 weeks to 2 weeks (reuse infrastructure)
Status: Planning complete, ready to start Day 1 development
2025-12-06 11:00:44 +08:00
d4d33528c7
feat(dc): Complete Phase 1 - Portal workbench page development
...
Summary:
- Implement DC module Portal page with 3 tool cards
- Create ToolCard component with decorative background and hover animations
- Implement TaskList component with table layout and progress bars
- Implement AssetLibrary component with tab switching and file cards
- Complete database verification (4 tables confirmed)
- Complete backend API verification (6 endpoints ready)
- Optimize UI to match prototype design (V2.html)
Frontend Components (~715 lines):
- components/ToolCard.tsx - Tool cards with animations
- components/TaskList.tsx - Recent tasks table view
- components/AssetLibrary.tsx - Data asset library with tabs
- hooks/useRecentTasks.ts - Task state management
- hooks/useAssets.ts - Asset state management
- pages/Portal.tsx - Main portal page
- types/portal.ts - TypeScript type definitions
Backend Verification:
- Backend API: 1495 lines code verified
- Database: dc_schema with 4 tables verified
- API endpoints: 6 endpoints tested (templates API works)
Documentation:
- Database verification report
- Backend API test report
- Phase 1 completion summary
- UI optimization report
- Development task checklist
- Development plan for Tool B
Status: Phase 1 completed (100%), ready for browser testing
Next: Phase 2 - Tool B Step 1 and 2 development
2025-12-02 21:53:24 +08:00