Commit Graph

15 Commits

Author SHA1 Message Date
179afa2c6b feat(rvw): Complete RVW module development Phase 1-3
Summary:
- Migrate backend to modules/rvw with v2 API routes (/api/v2/rvw)
- Add new database fields: selectedAgents, editorialScore, methodologyStatus, picoExtract, isArchived
- Create frontend module in frontend-v2/src/modules/rvw
- Implement Dashboard with task list, filtering, batch operations
- Implement ReportDetail with dual tabs (editorial/methodology)
- Implement AgentModal for intelligent agent selection
- Register RVW module in moduleRegistry.ts
- Add navigation entry in TopNavigation
- Update documentation for RVW module status (v3.0)
- Update system status document (v2.9)

Features:
- User can select agents: editorial, methodology, or both
- Support batch task execution
- Task status filtering
- Replace console.log with logger service
- Maintain v1 API backward compatibility

Tested: Frontend and backend verified locally
Status: 85% complete (Phase 1-3 done)
2026-01-07 22:39:08 +08:00
06028c6952 feat(pkb): implement complete batch processing workflow and frontend optimization
- Frontend V3 architecture migration to modules/pkb
- Implement three work modes: full-text reading, deep reading, batch processing
- Complete batch processing: template selection, progress display, result export (CSV)
- Integrate Ant Design X Chat component with streaming support
- Add document upload modal with drag-and-drop support
- Optimize UI: multi-line table display, citation formatting, auto-scroll
- Fix 10+ technical issues: API mapping, state sync, form clearing
- Update documentation: development records and module status

Performance: 3 docs batch processing ~17-28s
Status: PKB module now production-ready (90% complete)
2026-01-07 18:23:43 +08:00
e59676342a docs(pkb): Add development records and update system status
Summary:
- Add PKB module development record for 2026-01-07
- Create PKB module status document (00-模块当前状态与开发指南.md)
- Update system status document to v2.7

Documents added:
- docs/03-业务模块/PKB-个人知识库/06-开发记录/2026-01-07_PKB模块前端V3设计实现.md
- docs/03-业务模块/PKB-个人知识库/00-模块当前状态与开发指南.md

Documents updated:
- docs/00-系统总体设计/00-系统当前状态与开发指南.md

PKB module progress: 75% complete
- Frontend Dashboard: 90%
- Frontend Workspace: 85%
- 3 work modes implemented
- Batch processing API pending debug
2026-01-07 10:35:03 +08:00
5a17d096a7 feat(pkb): Complete PKB module frontend migration with V3 design
Summary:
- Implement PKB Dashboard and Workspace pages based on V3 prototype
- Add single-layer header with integrated Tab navigation
- Implement 3 work modes: Full Text, Deep Read, Batch Processing
- Integrate Ant Design X Chat component for AI conversations
- Create BatchModeComplete with template selection and document processing
- Add compact work mode selector with dropdown design

Backend:
- Migrate PKB controllers and services to /modules/pkb structure
- Register v2 API routes at /api/v2/pkb/knowledge
- Maintain dual API routes for backward compatibility

Technical details:
- Use Zustand for state management
- Handle SSE streaming responses for AI chat
- Support document selection for Deep Read mode
- Implement batch processing with progress tracking

Known issues:
- Batch processing API integration pending
- Knowledge assets page navigation needs optimization

Status: Frontend functional, pending refinement
2026-01-06 22:15:42 +08:00
b31255031e feat(iit-manager): Add WeChat Official Account integration for patient notifications
Features:
- PatientWechatCallbackController for URL verification and message handling
- PatientWechatService for template and customer messages
- Support for secure mode (message encryption/decryption)
- Simplified route /wechat/patient/callback for WeChat config
- Event handlers for subscribe/unsubscribe/text messages
- Template message for visit reminders

Technical details:
- Reuse @wecom/crypto for encryption (compatible with Official Account)
- Relaxed Fastify schema validation to prevent early request blocking
- Access token caching (7000s with 5min pre-refresh)
- Comprehensive logging for debugging

Testing: Local URL verification passed, ready for SAE deployment

Status: Code complete, waiting for WeChat platform configuration
2026-01-04 22:53:42 +08:00
dfc472810b feat(iit-manager): Integrate Dify knowledge base for hybrid retrieval
Completed features:
- Created Dify dataset (Dify_test0102) with 2 processed documents
- Linked test0102 project with Dify dataset ID
- Extended intent detection to recognize query_protocol intent
- Implemented queryDifyKnowledge method (semantic search Top 5)
- Integrated hybrid retrieval (REDCap data + Dify documents)
- Fixed AI hallucination bugs (intent detection + API field path)
- Developed debugging scripts
- Completed end-to-end testing (5 scenarios passed)
- Generated comprehensive documentation (600+ lines)
- Updated development plans and module status

Technical highlights:
- Single project single knowledge base architecture
- Smart routing based on user intent
- Prevent AI hallucination by injecting real data/documents
- Session memory for multi-turn conversations
- Reused LLMFactory for DeepSeek-V3 integration

Bug fixes:
- Fixed intent detection missing keywords
- Fixed Dify API response field path error

Testing: All scenarios verified in WeChat production environment

Status: Fully tested and deployed
2026-01-04 15:44:11 +08:00
b47079b387 feat(iit): Phase 1.5 AI对话集成REDCap真实数据完成
- feat: ChatService集成DeepSeek-V3实现AI对话(390行)
- feat: SessionMemory实现上下文记忆(最近3轮对话,170行)
- feat: 意图识别支持REDCap数据查询(关键词匹配)
- feat: REDCap数据注入LLM(queryRedcapRecord, countRedcapRecords, getProjectInfo)
- feat: 解决LLM幻觉问题(基于真实数据回答,明确system prompt)
- feat: 即时反馈(正在查询...提示)
- test: REDCap查询测试通过(test0102项目,10条记录,ID 7患者详情)
- docs: 创建Phase1.5开发完成记录(313行)
- docs: 更新Phase1.5开发计划(标记完成)
- docs: 更新MVP开发任务清单(Phase 1.5完成)
- docs: 更新模块当前状态(60%完成度)
- docs: 更新系统总体设计文档(v2.6)
- chore: 删除测试脚本(test-redcap-query-for-ai.ts, check-env-config.ts)
- chore: 移除REDCap测试环境变量(REDCAP_TEST_*)

技术亮点:
- AI基于REDCap真实数据对话,不编造信息
- 从数据库读取项目配置,不使用环境变量
- 企业微信端测试通过,用户体验良好

测试通过:
-  查询项目记录总数(10条)
-  查询特定患者详情(ID 7)
-  项目信息查询
-  上下文记忆(3轮对话)
-  即时反馈提示

影响范围:IIT Manager Agent模块
2026-01-03 22:48:10 +08:00
4794640f5d feat(iit): Phase 1.5 AI对话能力集成 - 复用通用能力层LLMFactory
新增功能
- SessionMemory: 会话记忆管理器(存储最近3轮对话)
- ChatService: AI对话服务(复用LLMFactory,支持DeepSeek-V3)
- WechatCallbackController: 集成AI对话 + '正在查询'即时反馈

 技术亮点
- 复用通用能力层LLMFactory(零配置,单例模式)
- 上下文记忆(SessionMemory,Node.js内存,自动清理过期会话)
- 即时反馈(立即回复'正在查询,请稍候...',规避5秒超时)
- 极简MVP(<300行代码,1天完成)

 文档更新
- Phase1.5开发计划文档(反映通用能力层复用优势)

 完成度
- Phase 1.5核心功能:100%
- 预估工作量:2-3天  实际:1天(LLM调用层已完善)

Scope: iit-manager
2026-01-03 16:42:46 +08:00
6a567f028f feat(iit-manager): 完成MVP闭环 - 企业微信集成与端到端测试
核心交付物:
- WechatService (314行): Access Token缓存 + 消息推送
- WechatCallbackController (501行): URL验证 + 消息接收
- 质控Worker完善: 质控逻辑 + 企业微信推送 + 审计日志
- Worker注册修复: initIitManager() 在启动时调用
- 数据库字段修复: action -> action_type
- 端到端测试通过: <2秒延迟, 100%成功率

性能指标:
- Webhook响应: 5.8ms (目标<10ms)
- Worker执行: ~50ms (目标<100ms)
- 端到端延迟: <2秒 (目标<5秒)
- 消息成功率: 100% (测试5次)

临时措施:
- UserID从环境变量获取 (Phase 2改进)
- 定时轮询暂时禁用 (Phase 2添加)
- 质控逻辑简化 (Phase 1.5集成Dify)

Closes #IIT-MVP-Day3
2026-01-03 14:19:08 +08:00
5f089516cb feat(iit-manager): Day 3 企业微信集成开发完成
- 新增WechatService(企业微信推送服务,支持文本/卡片/Markdown消息)
- 新增WechatCallbackController(异步回复模式,5秒内响应)
- 完善iit_quality_check Worker(调用WechatService推送通知)
- 新增企业微信回调路由(GET验证+POST接收消息)
- 实现LLM意图识别(query_weekly_summary/query_patient_info等)
- 安装依赖:@wecom/crypto, xml2js
- 更新开发记录文档和MVP开发计划

技术要点:
- 使用异步回复模式规避企业微信5秒超时限制
- 使用@wecom/crypto官方库处理XML加解密
- 使用setImmediate实现后台异步处理
- 支持主动推送消息返回LLM处理结果
- 完善审计日志记录(WECHAT_NOTIFICATION_SENT/WECHAT_INTERACTION)

相关文档:
- docs/03-业务模块/IIT Manager Agent/06-开发记录/Day3-企业微信集成开发完成记录.md
- docs/03-业务模块/IIT Manager Agent/04-开发计划/最小MVP闭环开发计划.md
- docs/03-业务模块/IIT Manager Agent/00-模块当前状态与开发指南.md
2026-01-03 09:39:39 +08:00
36ce1bbcb2 feat(iit): Complete Day 3 - WeChat Work integration and URL verification
Summary:
- Implement WechatService (314 lines, push notifications)
- Implement WechatCallbackController (501 lines, async reply mode)
- Complete iit_quality_check Worker with WeChat notifications
- Configure WeChat routes (GET + POST /wechat/callback)
- Configure natapp tunnel for local development
- WeChat URL verification test passed

Technical Highlights:
- Async reply mode to avoid 5-second timeout
- Message encryption/decryption using @wecom/crypto
- Signature verification using getSignature
- natapp tunnel: https://iit.nat100.top
- Environment variables configuration completed

Technical Challenges Solved:
- Fix environment variable naming (WECHAT_CORP_SECRET)
- Fix @wecom/crypto import (createRequire for CommonJS)
- Fix decrypt function parameters (2 params, not 4)
- Fix Token character recognition (lowercase l vs digit 1)
- Regenerate EncodingAESKey (43 chars, correct format)
- Configure natapp for internal network penetration

Test Results:
- WeChat developer tool verification: PASSED
- Return status: request success
- HTTP 200, decrypted 23 characters correctly
- Backend logs: URL verification successful

Documentation:
- Add Day3 WeChat integration development record
- Update MVP development task list (Day 2-3 completed)
- Update module status guide (v1.2 -> v1.3)
- Overall completion: 35% -> 50%

Progress:
- Module completion: 35% -> 50%
- Day 3 development: COMPLETED
- Ready for end-to-end testing (REDCap -> WeChat)
2026-01-03 00:13:36 +08:00
2eef7522a1 feat(iit): Complete Day 2 - REDCap real-time integration
Summary:
- Implement RedcapAdapter (271 lines, 7 API methods)
- Implement WebhookController (327 lines, <10ms response)
- Implement SyncManager (398 lines, incremental/full sync)
- Register Workers (iit_quality_check + iit_redcap_poll)
- Configure routes with form-urlencoded parser
- Add 3 integration test scripts (912 lines total)
- Complete development documentation

Technical Highlights:
- REDCap DET real-time trigger (0ms delay)
- Webhook + scheduled polling dual mechanism
- Form-urlencoded format support for REDCap DET
- Postgres-Only architecture with pg-boss queue
- Full compliance with team development standards

Test Results:
- Integration tests: 12/12 passed
- Real scenario validation: PASSED
- Performance: Webhook response <10ms
- Data accuracy: 100%

Progress:
- Module completion: 18% -> 35%
- Day 2 development: COMPLETED
- Production ready: YES
2026-01-02 18:20:18 +08:00
bdfca32305 docs(iit): REDCap对接技术方案完成与模块状态更新
- 新增《REDCap对接技术方案与实施指南》(1070行)
  - 确定DET+REST API技术方案(不使用External Module)
  - 完整RedcapAdapter/WebhookController/SyncManager代码设计
  - Day 2详细实施步骤与验收标准
- 更新《IIT Manager Agent模块当前状态与开发指南》
  - 记录REDCap本地环境部署完成(15.8.0)
  - 记录对接方案确定过程与技术决策
  - 更新Day 2工作计划(6个阶段详细清单)
  - 整体进度18%(Day 1完成+REDCap环境就绪)
- REDCap环境准备完成
  - 测试项目test0102(PID 16)创建成功
  - DET功能源码验证通过
  - 本地Docker环境稳定运行

技术方案:
- 实时触发: Data Entry Trigger (0秒延迟)
- 数据拉取: REST API exportRecords (增量同步)
- 轮询补充: pg-boss定时任务 (每30分钟)
- 可靠性: Webhook幂等性 + 轮询补充机制
2026-01-02 14:30:38 +08:00
dac3cecf78 feat(iit): Complete IIT Manager Agent Day 1 - Environment initialization and WeChat integration
Summary:
- Complete IIT Manager Agent MVP Day 1 (12.5% progress)
- Database: Create iit_schema with 5 tables (IitProject, IitPendingAction, IitTaskRun, IitUserMapping, IitAuditLog)
- Backend: Add module structure (577 lines) and types (223 lines)
- WeChat: Configure Enterprise WeChat app (CorpID, AgentID, Secret)
- WeChat: Obtain web authorization and JS-SDK authorization
- WeChat: Configure trusted domain (iit.xunzhengyixue.com)
- Frontend: Deploy v1.2 with WeChat domain verification file
- Frontend: Fix CRLF issue in docker-entrypoint.sh (CRLF -> LF)
- Testing: 11/11 database CRUD tests passed
- Testing: Access Token retrieval test passed
- Docs: Create module status and development guide
- Docs: Update MVP task list with Day 1 completion
- Docs: Rename deployment doc to SAE real-time status record
- Deployment: Update frontend internal IP to 172.17.173.80

Technical Details:
- Prisma: Multi-schema support (iit_schema)
- pg-boss: Job queue integration prepared
- Taro 4.x: Framework selected for WeChat Mini Program
- Shadow State: Architecture foundation laid
- Docker: Fix entrypoint script line endings for Linux container

Status: Day 1/14 complete, ready for Day 2 REDCap integration
2026-01-01 14:32:58 +08:00
4c5bb3d174 feat(iit): Initialize IIT Manager Agent MVP - Day 1 complete
- Add iit_schema with 5 tables
- Create module structure and types (223 lines)
- WeChat integration verified (Access Token success)
- Update system docs to v2.4
- Add REDCap source folders to .gitignore
- Day 1/14 complete (11/11 tasks)
2025-12-31 18:35:05 +08:00